What is MR PR1
|
Storage and Collection of Recyclables
|
|
What us the Reference Standard for MR PR1
|
CIWMB 1999 (California Integrated Waste Management Board)
|
|
What is MR Credit 1.1
|
Building Reuse - Maintain 75% of Existing Walls, Floors, and Roof
|
|
What is MR Credit 1.2
|
Building Reuse - Maintain 95% of Existing Walls, Floors, and Roof
|
|
What is MR Credit 1.3
|
Materials and Resources 1.3 - Building Reuse - Maintain 50% of Existing Non-Structural Elements
|
|
What is MR 2.1
|
Construction Waste Management - Divert 50%
|
|
What is MR 2.2
|
Construction Waste Management - Divert 75%
|
|
How do you get Innovation Credit for MR 2.2
|
Construction Waste Management - Divert 95%
|
|
What is MR 3.1
|
Material Reuse - 5% Reused Items
|
|
What is MR 3.2
|
Material Reuse - 10% Reused Items
|
|
What is MR 4.1
|
Recycled Content - 10% Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
|
|
What is MR 4.2
|
Recycled Content - 20% Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
|
|
What is MR 5.1
|
Regional Materials - 10% Extracted, Processed & Manufactured Regionally
|
|
What is MR 5.3
|
Regional Materials - 20% Extracted, Processed & Manufactured Regionally
|
|
What is the rule of thumb to determine material costs
|
45% of total construction cost
|
|
What is MR 6
|
Materials and Resources 6 - Rapidly Renewable Materials
2.5% |
|
What is the maximum harvest cycle for a rapidly renewable material
|
10 years
|
|
How do you get an Innovation credit for MR 6
|
5% cost of materials must be rapidly renewable
|
|
What is MR 7
|
Certified wood 50% by FSC based on costs.
|
|
How do you get an Innovation credit for MR 7
|
Use 95% FSC Certified Woods
|
|
What are the units used to calculate MR Credit 2
|
Based on Weight or Volume
|