Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
21 Cards in this Set
- Front
- Back
SSc2
|
The project itself must have a density of at least double that of the average density within the calculated area
OR The average density within an area twice as large as that for the base credit achievement must be at least 120,000 sf/acre. To double the area, use equation 2 but double the property area first. The project must not lower the existing average density of the area. |
|
SSc4.1
|
Project located within 1/2 mile of TWO rail lines OR within 1/4 mile of TWO or more stops for FOUR or more bus lines
AND At least 200 transit rides per day are available at these stops. Combining bus and rail rides is allowable |
|
SSc4.1, 4,2, 4.3, and 4.4
|
Project must include a "comprehensive transportation management plan that demonstrates a quantifiable reduction in personal automobile use"
|
|
SSc5.1
|
Restore or protect 75% of the site area
|
|
SSc5.2
|
Option 1 - Exceed zoning requirement by 50%
Option 2 - Provide open space equal to double the building's footprint Option 3 - Provide open space for 40% of the site area |
|
SSc7.1
|
100% of parking under cover or "a minimum of 100%" of non-roof impervious surfaces meet requirements (high-albedo, open grid, or shaded within 5 years)
|
|
SSc7.2
|
100% of roof (excluding mechanical equipment) is a vegetated green-roof (not just high-albedo)
|
|
WEc2
|
100% reduction in potable water use for sewage conveyance or 100% treatment of waste
|
|
WEc3
|
40% reduction in potable water use for regulated fixtures, or 10% reduction in process or other non-regulated water use
|
|
EAc1
|
New buildings must exceed ASHRAE 90.1-2004 by at least 45.5%
Existing buildings must exceed ASHRAE 90.1-2004 by at least 38.5% |
|
EAc2
|
Renewable energy generated on-site must be 17.5% or greater of total energy used.
|
|
EAc6
|
Double the amount of REC's purchased either by amount (70% of energy consumed) or time period (4 year contract). NOTE - this exemplary performance option was not listed in my hard-copy 1st edition manual, but is in the second edition.
|
|
MRc2
|
Divert 95% of waste from the landfill
|
|
MRc3
|
15% of materials must be reused
|
|
MRc4
|
30% of materials must be recycled
|
|
MRc5
|
40% of materials must be regional
|
|
MRc6
|
10% of materials must be renewable
|
|
MRc7
|
95% of wood must be FSC certified
|
|
EQc8.1
|
Daylight 95% of spaces
|
|
EQc8.2
|
Eligible for exemplary performance, but there's no real guidance on what you need to do... "Projects will be evaluated on a case-by-case basis."
|
|
What is the rule of thumb for determining Exemplary Performance
|
1) Next would-be incriment
2) Doubling Amount 3) Doubling Contract |