3 Cards in this Set

  • Front
  • Back

A customer wants to accept a bid but does not have enough money. A war contract decision wold be;

Do the job at cost

When biddin a job, what is the best way to assess the job?

Inspect the job personally

If a contractor has a written contract based on "time and materials", what should be done to cover and increase in overhead cost?

There in nothing he can do to recover the additional a cost


Overhead is not related to time and material