• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/11

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

11 Cards in this Set

  • Front
  • Back
THE MOD 0/2 JBDS HAVE _____ PANELS PER ASSEMBLY.
6
WHAT MOD OF JBD'S HAS THE TWO SIDE PLATE COOLING MODULES PER PANEL?
MOD 2
THE MOD 1 JBD'S HAVE _______ PANELS PER JBD ASSEMBLY AND ARE ONLY ENSTALLED ON CATAPULT #_____.1
1. 4
2. 4
THE SLANT HEIGHT FOR C-13 MK 7 MOD 0/1/2 JBD PANEL ASSEMBLY IS ________
14 FEET
THE WIDTH FOR THE C-13 MK 7 MOD 0/2 JBD PANEL ASSEMBLY IS ________..
36 FEET
THE WIDTH FOR THE C-13 MK 7 MOD 1 JBD PANEL ASSEMBLY IS ______
23 FT, 9 IN
A WATER PRESSURE OF _________TO ________PSI FLOWS INTO TUBE ASSEMBLIES.
90 TO 110
THE JBD ANGLE IS ______.
60 DEGREES
THE MOD 0/2 JBD ASSEMBLY HAS _____ CYLINDERS AND THE MOD 1 HAS ______ CYLINDERS.
1. 6
2. 4
EMERGENCY LOWERING BYPASS LINES AND BYPASS VALVES ARE CONNECTED TO THE __________SIDE OF EACH CYLINDER AND TO THE _______LINES.
1. RAISE
2. GRAVITY RETURN
WHAT ARE THE 3 CONTROL SYSTEMS TO THE JBD'S?
1. DECKEDGE
2. PORABLE ELECTRICAL
3. AUXILIARY