Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
11 Cards in this Set
- Front
- Back
THE MOD 0/2 JBDS HAVE _____ PANELS PER ASSEMBLY.
|
6
|
|
WHAT MOD OF JBD'S HAS THE TWO SIDE PLATE COOLING MODULES PER PANEL?
|
MOD 2
|
|
THE MOD 1 JBD'S HAVE _______ PANELS PER JBD ASSEMBLY AND ARE ONLY ENSTALLED ON CATAPULT #_____.1
|
1. 4
2. 4 |
|
THE SLANT HEIGHT FOR C-13 MK 7 MOD 0/1/2 JBD PANEL ASSEMBLY IS ________
|
14 FEET
|
|
THE WIDTH FOR THE C-13 MK 7 MOD 0/2 JBD PANEL ASSEMBLY IS ________..
|
36 FEET
|
|
THE WIDTH FOR THE C-13 MK 7 MOD 1 JBD PANEL ASSEMBLY IS ______
|
23 FT, 9 IN
|
|
A WATER PRESSURE OF _________TO ________PSI FLOWS INTO TUBE ASSEMBLIES.
|
90 TO 110
|
|
THE JBD ANGLE IS ______.
|
60 DEGREES
|
|
THE MOD 0/2 JBD ASSEMBLY HAS _____ CYLINDERS AND THE MOD 1 HAS ______ CYLINDERS.
|
1. 6
2. 4 |
|
EMERGENCY LOWERING BYPASS LINES AND BYPASS VALVES ARE CONNECTED TO THE __________SIDE OF EACH CYLINDER AND TO THE _______LINES.
|
1. RAISE
2. GRAVITY RETURN |
|
WHAT ARE THE 3 CONTROL SYSTEMS TO THE JBD'S?
|
1. DECKEDGE
2. PORABLE ELECTRICAL 3. AUXILIARY |