• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
Software lifecycle
the period of time that begins when a software product is conceived and ends when the software is not longer available
System of systems
multiple heterogeneous, distributed systems that are embedded in network at multiple levels and in multiple domains and are interconnected, addressing large scale interdisciplinary common problems & purposes.
Name SW Lifecycle steps
1. Concept phase
2. Requirements phase
3. Design phase
4. Implementation phase
5. Test phase
6. Installation & check out phase
7. Operation & maintenance phase
8. Reirement phase (optional)
NB: Phases can overlap or be performed iteratively
Name typical Test levels
1. Unit or component
2. Integration
3. System
4. Acceptance
When does test analysis start?
Test analysis starts immediately after or even concurrently with test planning