• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/8

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

8 Cards in this Set

  • Front
  • Back
Chapter 5 Section 5.1 Input

Enterprise Environmental Factors
A. Organizations culture
B. Infrastructure
C. Tools
D. Human Resources
E. Personnel Policies
F. Marketplace conditions
Chapter 5 Section 5.1 Input

Organizational Process Assets
Formal and Informal policies, procedures and guidelines
Chapter 5 Section 5.1 Input

Project Charter
1
Chapter 5 Section 5.1 Input

Preliminary Project Scope Statement
1
Chapter 5 Section 5.1 Input

Project Management Plan
1
Chapter 5 Section 5.1 T&T

Expert Judgment
How equivalent projects have managed scope is considered
Chapter 5 Section 5.1 T&T

Templates, Forms, Standards
A. WBS Templates
B. Scope management plan templates
C. Project scope change control documents
Chapter 5 Section 5.1 Ouput

Project Scope Management Plan
Provides guidance on how project scope will be defined, documented, verified, managed and controlled. These include a Process to: Prepare a detailed project scope statement based upon the preliminary project scope statement.
Enables the creation of the WBS and defines how it will be maintained
Specifies how formal verification and acceptance of the final deliverable will be obtained
Control how requests for changes to the detailed project scope statement will be processed. ** This process is directly linked to the integrated change control process