Study your flashcards anywhere!

Download the official Cram app for free >

  • Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

A key: Read text to speech.a key

image

Play button

image

Play button

image

Progress

1/202

Click to flip

202 Cards in this Set

  • Front
  • Back
Accepted deliverables
Output:
Verify Scope
Input:
Close Project or Phase
Acquisition
Tools & Techniques
Acquire Project Team
Activity attributes
Output:
Define Activities
Input:
Develop Schedule
Estimate Activity Durations
Estimate Activity Resources
Sequence Activities
Activity cost estimates
Output:
Estimate Costs
Input:
Plan Procurements
Identify Risks
Determine Budget
Activity duration estimates
Output:
Estimate Activity Durations
Input:
Identify Risks
Develop Schedule
Activity list
Output:
Define Activities
Input:
Develop Schedule
Estimate Activity Durations
Estimate Activity Resources
Sequence Activities
Activity resource requirements
Output:
Estimate Activity Resources
Input:
Plan Procurements
Develop Human Resource Plan
Develop Schedule
Estimate Activity Durations
Additional quality planning tools
Tools & Techniques:
Plan Quality
Adjusting leads and lags
Tools & Techniques:
Control Schedule
Advertising
Tools & Techniques:
Conduct Procurements
Alternative analysis
Tools & Techniques:
Estimate Activity Resources
Alternatives Identification
Tools & Techniques:
Define Scope
Analogous estimating
Tools & Techniques:
Estimate Activity Durations
Estimate Costs
Applying leads and lags
Tools & Techniques:
Sequence Activities
Develop Schedule
Approved change requests
Input:
Direct and Manage Project Execution
Perform Quality Control
Administer Procurements
Approved change requests review
Tools & Techniques:
Perform Quality Control
Assumptions analysis
Tools & Techniques:
Identify Risks
Basis of estimates
Output:
Estimate Costs
Input:
Determine Budget
Benchmarking
Tools & Techniques:
Plan Quality
Bidder conferences
Tools & Techniques:
Conduct Procurements
Bottom-up estimating
Tools & Techniques:
Estimate Activity Resources
Estimate Costs
Budget forecasts
Input:
Report Performance
Business case
Input:
Develop Project Charter
Cause and effect diagrams
Tools & Techniques:
Perform Quality Control
Change control meetings
Tools & Techniques:
Perform Integrated Change Control
Change log
Input:
Manage Stakeholder Expectations
Change request status updates
Output:
Perform Integrated Change Control
Change requests
Output:
Direct and Manage Project Execution
Monitor and Control Project Work
Verify Scope
Control Scope
Control Schedule
Perform Quality Assurance
Perform Quality Control
Manage Project Team
Manage Stakeholder Expectations
Report Performance
Monitor and Control Risks
Plan Procurements
Conduct Procurements
Administer Procurements
Input:
Perform Integrated Change Control
Checklist analysis
Tools & Techniques:
Identify Risks
Claims administration
Tools & Techniques:
Administer Procurements
Closed procurements
Output:
Close Procurements
Co-location
Tools & Techniques:
Develop Project Team
Communication methods
Tools & Techniques:
Plan Communications
Distribute Information
Manage Stakeholder Expectations
Report Performance
Communication models
Tools & Techniques:
Plan Communications
Communication requirements analysis
Tools & Techniques:
Plan Communications
Communication technology
Tools & Techniques:
Plan Communications
Communications management plan
Output:
Plan Communications
Input:
Plan Risk Management
Conflict management
Tools & Techniques:
Manage Project Team
Contingent response strategies
Tools & Techniques:
Plan Risk Responses
Contract
Input:
Develop Project Charter
Administer Procurements
Contract change control system
Tools & Techniques:
Administer Procurements
Contract types
Tools & Techniques:
Plan Procurements
Contracts
Input:
Determine Budget
Control charts
Tools & Techniques:
Plan Quality
Perform Quality Control
Cost aggregation
Tools & Techniques:
Determine Budget
Control Costs
Cost management plan
Input:
Plan Risk Management
Identify Risks
Perform Quantitative Risk Analysis
Cost of quality
Tools & Techniques:
Estimate Costs
Plan Quality
Cost performance baseline
Output:
Control Costs
Determine Budget
Input:
Plan Procurements
Plan Quality
Cost-benefit analysis
Tools & Techniques:
Plan Quality
Critical chain method
Tools & techniques:
Develop Schedule
Critical path method
Tools & techniques:
Develop Schedule
Data gathering and representation techniques
Tools & Techniques:
Perform Quantitative Risk Analysis
Decomposition
Tools & Techniques:
Create WBS
Define Activities
Deliverables
Output:
Direct and Manage Project Execution
Perform Quality Control
Dependency determination
Tools & Techniques:
Sequence Activities
Design of experiments
Tools & Techniques:
Plan Quality
Diagramming techniques
Tools & Techniques:
Identify Risks
Documentation reviews
Tools & Techniques:
Identify Risks
Enterprise environmental factors updates
Output:
Develop Project Team
Plan Procurements
Input:
Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Define Activities
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Estimate Costs
Plan Quality
Develop Human Resource Plan
Acquire Project Team
Identify Stakeholders
Plan Communications
Plan Risk Management
Identify Risks
Plan Procurements
Expert judgment
Tools & Techniques:
Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Define Scope
Define Activities
Estimate Activity Resources
Estimate Activity Durations
Estimate Costs
Determine Budget
Control Costs
Identify Stakeholders
Identify Risks
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Plan Procurements
Conduct Procurements
Facilitated workshops
Tools & Techniques:
Collect Requirements
Define Scope
Final product, service, or result transition
Output:
Close Project or Phase
Flowcharting
Tools & Techniques:
Plan Quality
Perform Quality Control
Focus groups
Tools & Techniques:
Collect Requirements
Forecasting methods
Tools & Techniques:
Report Performance
Funding limit reconciliation
Tools & Techniques:
Determine Budget
Control Costs
Ground rules
Tools & Techniques:
Develop Project Team
Group creativity techniques
Tools & Techniques:
Collect Requirements
Group decision making techniques
Tools & Techniques:
Collect Requirements
Histogram
Tools & Techniques:
Perform Quality Control
Historical relationships
Tools & Techniques:
Determine Budget
Control Costs
Human resource plan
Output:
Develop Human Resource Plan
Input:
Estimate Costs
Independent estimates
Tools & Techniques:
Conduct Procurements
Information distribution tools
Tools & Techniques:
Distribute Information
information gathering techniques
Tools & Techniques:
Identify Risks
Inspection
Tools & Techniques:
Perform Quality Control
Verify Scope
Inspections and audits
Tools & Techniques:
Administer Procurements
Internet search
Tools & Techniques:
Conduct Procurements
Interpersonal skills
Tools & Techniques:
Develop Project Team
Manage Project Team
Manage Stakeholder Expectations
Interviews
Tools & Techniques:
Collect Requirements
Issue log
Input:
Manage Stakeholder Expectations
Tools & Techniques:
Manage Project Team
Make-or-buy analysis
Tools & Techniques:
Plan Procurements
Make-or-buy decisions
Output:
Plan Procurements
Input:
Conduct Procurements
Management skills
Tools & Techniques:
Manage Stakeholder Expectations
Milestone list
Output:
Define Activities
Input:
Sequence Activities
Negotiated settlements
Tools & Techniques:
Close Procurements
Negotiation
Tools & Techniques:
Acquire Project Team
Networking
Tools & Techniques:
Develop Human Resource Plan
Observation and conversation
Tools & Techniques:
Manage Project Team
Observations
Tools & Techniques:
Collect Requirements
Organization charts and position descriptions
Tools & Techniques:
Develop Human Resource Plan
Organizational process assets
Input:
Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Define Scope
Create WBS
Control Scope
Define Activities
Sequence Activities
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Control Schedule
Estimate Costs
Determine Budget
Control Costs
Plan Quality
Perform Quality Control
Develop Human Resource Plan
Acquire Project Team
Manage Project Team
Identify Stakeholders
Plan Communications
Distribute Information
Manage Stakeholder Expectations
Report Performance
Plan Risk Management
Identify Risks
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Procurements
Conduct Procurements
Organizational process assets updates
Output:
Close Project or Phase
Control Scope
Control Schedule
Perform Quality Assurance
Perform Quality Control
Manage Project Team
Distribute Information
Manage Stakeholder Expectations
Report Performance
Monitor and Control Risks
Administer Procurements
Close Procurements
Organizational theory
Tools & Techniques:
Develop Human Resource Plan
Outputs from planning processes
Input:
Develop Project Management Plan
Parametric estimating
Tools & Techniques:
Estimate Activity Durations
Estimate Costs
Pareto chart
Tools & Techniques:
Perform Quality Control
Payment systems
Tools & Techniques:
Administer Procurements
Performance reporting
Tools & Techniques:
Administer Procurements
Performance reports
Output:
Report Performance
Input:
Monitor and Control Project Work
Manage Project Team
Distribute Information
Monitor and Control Risks
Administer Procurements
Performance reviews
Tools & Techniques:
Control Schedule
Plan Quality and Perform Quality Control tools and techniques
Tools & Techniques:
Perform Quality Assurance
Planning meetings and analysis
Tools & Techniques:
Plan Risk Management
Pre-assignment
Tools & Techniques:
Acquire Project Team
Precedence diagramming method (PDM)
Tools & Techniques:
Sequence Activities
Probability and impact matrix
Tools & Techniques:
Perform Qualitative Risk Analysis
Process analysis
Tools & Techniques:
Perform Quality Assurance
Process improvement plan
Output:
Plan Quality
Procurement audits
Tools & Techniques:
Close Procurements
Procurement contract award
Output:
Conduct Procurements
Procurement documentation
Output:
Administer Procurements
Input:
Close Procurements
Procurement documents
Output:
Plan Procurements
Input:
Identify Stakeholders
Conduct Procurements
Administer Procurements
Procurement management plan
Output:
Plan Procurements
Procurement negotiations
Tools & Techniques:
Conduct Procurements
Procurement performance reviews
Tools & Techniques:
Administer Procurements
Procurement statements of work
Output:
Plan Procurements
Product analysis
Tools & Techniques:
Define Scope
Project charter
Output:
Develop Project Charter
Input:
Develop Project Management Plan
Collect Requirements
Define Scope
Identify Stakeholders
Project document updates
Output:
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Define Scope
Create WBS
Verify Scope
Control Scope
Sequence Activities
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Control Schedule
Estimate Costs
Determine Budget
Control Costs
Plan Quality
Perform Quality Assurance
Perform Quality Control
Plan Communications
Manage Stakeholder Expectations
Plan Risk Responses
Monitor and Control Risks
Conduct Procurements
Project documents
Input:
Identify Risks
Conduct Procurements
Project funding requirements
Output:
Control Costs
Determine Budget
Input:
Control Costs
Project management estimating software
Tools & Techniques:
Estimate Costs
Direct and Manage Project Execution
Project management plan
Output:
Develop Project Management Plan
Input:
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Verify Scope
Control Scope
Control Schedule
Control Costs
Perform Quality Assurance
Perform Quality Control
Acquire Project Team
Develop Project Team
Manage Project Team
Distribute Information
Manage Stakeholder Expectations
Report Performance
Monitor and Control Risks
Conduct Procurements
Administer Procurements
Close Procurements
Project management plan updates
Output:
Direct and Manage Project Execution
Monitor and Control Project Work
Perform Integrated Change Control
Control Scope
Control Schedule
Perform Quality Assurance
Perform Quality Control
Acquire Project Team
Manage Project Team
Manage Stakeholder Expectations
Plan Risk Responses
Monitor and Control Risks
Conduct Procurements
Administer Procurements
Project management software
Tools & Techniques:
Estimate Activity Resources
Control Schedule
Project performance appraisals
Tools & Techniques:
Manage Project Team
Project schdule network diagrams
Output:
Sequence Activities
Input:
Develop Schedule
Project schedule
Output:
Develop Schedule
Input:
Control Schedule
Estimate Costs
Determine Budget
Plan Procurements
Project scope statement
Output:
Define Scope
Input:
Create WBS
Sequence Activities
Estimate Activity Durations
Develop Schedule
Plan Risk Management
Perform Qualitative Risk Analysis
Project staff assignments
Output:
Acquire Project Team
Input:
Develop Project Team
Manage Project Team
Project statement of work
Input:
Develop Project Charter
Proposal evaluation techniques
Tools & Techniques:
Conduct Procurements
Proprietary quality management methodologies
Tools & Techniques:
Plan Quality
PrototypesCollect
Tools & Techniques:
Collect Requirements
Published estimating data
Tools & Techniques:
Estimate Activity Resources
Qualified seller list
Input:
Conduct Procurements
Quality audits
Tools & Techniques:
Perform Quality Assurance
Quality checklists
Output:
Plan Quality
Input:
Perform Quality Control
Quality control measurements
Output:
Perform Quality Control
Input:
Perform Quality Assurance
Quality management plan
Output:
Plan Quality
Input:
Identify Risks
Quality metrics
Output:
Plan Quality
Input:
Perform Quality Assurance
Perform Quality Control
Quantitative risk analysis and modeling techniques
Tools & Techniques:
Perform Quantitative Risk Analysis
Questionnaires and sruveys
Tools & Techniques:
Collect Requirements
Recognition and rewards
Tools & Techniques:
Develop Project Team
Records management system
Tools & Techniques:
Administer Procurements
Close Procurements
Reporting systems
Tools & Techniques:
Report Performance
Requirements documentation
Output:
Collect Requirements
Input:
Define Scope
Create WBS
Control Scope
Plan Procurements
Verify Scope
Requirements management plan
Output:
Collect Requirements
Requirements traceablity matrix
Output:
Collect Requirements
Input:
Verify Scope
Control Scope
Reserve analysis
Tools & Techniques:
Estimate Activity Durations
Estimate Costs
Determine Budget
Control Costs
Monitor and Control Risks
Resource breadown structure
Output:
Estimate Activity Resources
Resource calendars
Output:
Acquire Project Team
Conduct Procurements
Input:
Estimate Activity Resources
Estimate Activity Durations
Develop Schedule
Determine Budget
Develop Project Team
Resource leveling
Tools & Techniques:
Develop Schedule
Control Schedule
Risk audits
Tools & Techniques:
Monitor and Control Risks
Risk categorization
Tools & Techniques:
Perform Qualitative Risk Analysis
Risk data quality assessment
Tools & Techniques:
Perform Qualitative Risk Analysis
Risk management plan
Output:
Plan Risk Management
Input:
Identify Risks
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Risk probability and impact assessment
Tools & Techniques:
Perform Qualitative Risk Analysis
Risk reassessment
Tools & Techniques:
Monitor and Control Risks
Risk register
Output:
Identify Risks
Input:
Estimate Costs
Plan Quality
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Monitor and Control Risks
Plan Procurements
Risk register updates
Output:
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Monitor and Control Risks
Risk urgency assessment
Tools & Techniques:
Perform Qualitative Risk Analysis
Risk-related contract decisions
Output:
Plan Risk Responses
Input:
Plan Procurements
Rolling wave planning
Tools & Techniques:
Define Activities
Run chart
Tools & Techniques:
Perform Quality Control
Scatter diagram
Tools & Techniques:
Perform Quality Control
Schedule baseline
Output:
Develop Schedule
Input:
Plan Quality
Schedule compression
Tools & Techniques:
Develop Schedule
Control Schedule
Schedule data
Output:
Develop Schedule
Schedule management plan
Input:
Plan Risk Management
Identify Risks
Perform Quantitative Risk Analysis
Schedule network analysis
Tools & Techniques:
Develop Schedule
Scheduling tool
Tools & Techniques:
Develop Schedule
Control Schedule
Scope baseline
Output:
Create WBS
Input:
Define Activities
Estimate Costs
Determine Budget
Plan Quality
Identify Risks
Plan Procurements
Selected sellers
Output:
Conduct Procurements
Seller proposals
Input:
Conduct Procurements
Source selection criteria
Output:
Plan Procurements
Input:
Conduct Procurements
Stakeholder analysis
Tools & Techniques:
Identify Stakeholders
Stakeholder management strategy
Output:
Identify Stakeholders
Input:
Manage Stakeholder Expectations
Plan Communications
Stakeholder register
Output:
Identify Stakeholders
Input:
Collect Requirements
Plan Quality
Plan Communications
Manage Stakeholder Expectations
Identify Risks
Statistical sampling
Tools & Techniques:
Plan Quality
Perform Quality Control
Status meetings
Tools & Techniques:
Monitor and Control Risks
Strategies for negative risks or threats
Tools & Techniques:
Plan Risk Responses
Strategies for positive risks or opportunities
Tools & Techniques:
Plan Risk Responses
SWOT analysis
Tools & Techniques:
Identify Risks
Team performance assessments
Output:
Develop Project Team
Input:
Manage Project Team
Team-building activities
Tools & Techniques:
Develop Project Team
Teaming agreements
Input:
Plan Procurements
Conduct Procurements
Technical performance measurement
Tools & Techniques:
Monitor and Control Risks
Templates
Tools & Techniques:
Define Activities
Three-point estimates
Tools & Techniques:
Estimate Activity Durations
Estimate Costs
Training
Tools & Techniques:
Develop Project Team
Validated changes
Output:
Perform Quality Control
Validated deliverables
Output:
Perform Quality Control
Input:
Verify Scope
Variance analysis
Tools & Techniques:
Control Scope
Control Schedule
Report Performance
Variance and trend analysis
Tools & Techniques:
Monitor and Control Risks
Vendor bid analysis
Tools & Techniques:
Estimate Costs
Virtual teams
Tools & Techniques:
Acquire Project Team
WBS
Output:
Create WBS
WBS dictionary
Output:
Create WBS
What-if scenario analysis
Tools & Techniques:
Develop Schedule
Control Schedule
Work performance information
Output:
Direct and Manage Project Execution
Input:
Perform Integrated Change Control
Control Scope
Control Schedule
Control Costs
Perform Quality Assurance
Report Performance
Monitor and Control Risks
Administer Procurements
Work performance measurements
Output:
Control Scope
Control Schedule
Input:
Perform Quality Control
Report Performance