• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/18

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

18 Cards in this Set

  • Front
  • Back

The numbering scheme used to identify hose will include the last two digits of the Year followed by the ___ of the hose.

Number

For 1.75 inch and 2 inch hose the number will be followed by a letter indicating the ___ of the hose.

Color

001-199

1.75 inch hosr

Stenciled numbering shall be located within ___ ___ of the coupling at one end and in the same location on the opposite side at the other end of the section of hose.

One foot

200-399

2 inch hose

400-599

2.5 inch hose

600-799

3 inch hoss

800-999

5 inch hose

When the hose is placed in service, the company placing the hose in service will stencil the company ID after the ___ ID number.

Hose

When hose is placed in service, and email shall be sent to the ___ shift station 5 officer, stating the ID numbers of the hose and the apparatus the hose has been assigned to.

B

___ shall be checked prior to connecting any two hose sections.

Gaskets

What is the test pressure and minutes tested for inch and 3/4 and 2 inch hose?

300 PSI 5 minutes

What is the test pressure and minutes tested for 3 inch

250 PSI for 5 minutes

What is the test pressure in minutes tested for 5 inch hose?

200 PSI for 5 minutes

Who emails the test results to the B shift station 5 officer?

Officer-in-charge

The B station 5 officer shall retain a copy of the test results and shall notify the ___ shift battalion chief when all tests have been completed

B

Hose testing records shall be entered into the fire department's Firehouse inventory module by who?

B shift station 5 officer

The B shift station 5 officer shall maintain an ___ list of Hose assignments and hose available for service.

Inventory