• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

220kv line protection has a primary and secondary relay system. What are they?

Primary:PLC (power line carrier)



Secondary: Set of electromechanical relays.

500kv line protection is composed of:

2 or 3 pilot relaying systems



2 direct transfer trip relaying systems



1 set of back up relays

Eash CB in the bulk system is equiped with a C60 relay for__________protection.

Local Breaker Failure Backup (LPFB)