• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back
What is the process of scope management?
Collect requirements
Define scope
Create WBS
Verify scope
Control scope
What is the definition of scope management
Doing all the work and only the work included in the project

Determining if work is included in the project or not
In which processes the scope management plan created?
The scope management plan is created in the integration management process as part of develop project management plan
What a key outputs of the collect requirements process?
Requirements management plan
Requirements documentation
Requirements traceability matrix
What is a key output of the defined scope process?
Project scope statement
What a key outputs of the create WBS process?
Work breakdown structure WBS
WBS dictionaries
Scope baseline
Change requests
What a key outputs of the verified scope process
Accepted deliverables
Change requests
Project document updates
What a key outputs of the control scope process
Work performance measurements
Change requests
Update to the project management plan and project documents
Name several requirements gathering techniques
Interviewing
Focus groups
Facilitated workshops
Brain storming
Affinity diagrams
Questionnaires
Prototypes
What is included in requirements traceability matrix
Requirement identification number
Source of the requirement
Who is responsible for the requirement
Who is assigned to manage the requirement
Status of the requirement
What is a project scope statement?
What are the key items included?
A written description of the project deliverables and the work required to create those deliverables
It includes :
Product scope
Deliverables
Product acceptance criteria
What is not part of the project
Additional risks
Constraints and assumptions
Product analysis is part of which scope management process?
Product analysis occurs during the defined scope process.
What is a work break down structure (WBS)?
Created during project planning by the team and used to define or decompose the project into smaller more manageable pieces.
It is used to help determine project:
Staffing
Estimating
Scheduling
Risk management
What does a Work Breakdown Structure show?
Hierarchies
Interrelationships
Work packages
Control account
Numbering system
What is decomposition?
Subdividing the major deliverables into smaller more manageable components.
What is a WBS dictionary?
A description of the work to be done for each work package
How are work packages different from activities
Activities are generated from each work package
Work packages are shown in a WBS
Activities are shown in an activity list and network Diagram
What is the verify scope process?
When is it done?
The process of formalizing acceptance of the project scope by the stakeholders or customer.
It is done during project monitoring and controlling and at the end of each phase of the project life cycle.
What is the difference between product scope and project scope?
Product scope is requirements that relate to the product of the project.
Project scope is the project management work needed to accomplish the product scope
What makes up the scope baseline?
Project scope statement
WBS
WBS dictionaries