• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/11

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

11 Cards in this Set

  • Front
  • Back

7 Project categories

1. Replacement: needed to continue current operations


2. Replacement: cost reduction


3. Expansion of existing products or markets


4. Expansion into new products or markets


5. Safety and/or enviromental projects


6. Other projects


7.Mergers

Strategic Business Plan

A long run plan that outlines in broad terms the firms basic strategy for the next 5 to 10 years

Net Present Value

A method of ranking investment proposals using the NPV, which is equal to the present value of the projects free cash flows discounted at the cost of capital

Independent Projects

Projects with cash flows that are not affected by the acceptance or non-acceptance of other projects

Mutually exclusive projects

A set of projects where only one can be accepted

Internal Rate of Return

The discount rate that forces a projects NPV to equal zero

Multiple IRRS

the situation where a project has two or more IRRS

Net Present Value Profile

A graph showing the relationship between a projects NPV and the firms cost of capital

Cross-over Rate

The cost of capital at which the NPV profiles of two projects cross and, thus, at which the projects NPVs are equal

Payback Period

The length of time required for an investments cash flows to cover its costs

Discounted Payback

The length of time required for an investments cash flows, discounted at the investments cost of capital, to cover its cost.