• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back
Egress/Ingress
Egress/Ingress: Before egress, each crewmember should verify their waist tether or daisy chain load path to structure and report for each hook, “bail closed, hook locked black on black, good pull test”

After egress and Safety Tether Installation, each crew member should verify both hooks on their Safety Tether, “bail closed, hook locked black on black, good pull test, reel in unlocked”

The same tether calls apply to ingress
Tether Swaps
Tether Swaps: “I have my new safety tether anchored on handrail ___.”
“Bail closed, hook locked black on black, good pull test.”
“I have my old/Airlock safety tether attached to handrail ___.”
APFR
APFR: “The APFR is installed, locking collar black on black, good pull test.”
Read settings from the base up: Clocking, pitch, roll, yaw
PGT
PGT: Always verify PGT settings, turn count, and bolt sequence before starting task

Report LEDs, display, torque, and turns for bolt/drive engagement. Bolt release normally only requires turn count.
Electrical
Electrical: Always verify inhibits are in place before electrical connector operations
“Good pins, no FOD, good EMI band.”
Fluid QD
Fluid QD: Reference EVA Task Checklist for most recent QD steps