• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/97

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

97 Cards in this Set

  • Front
  • Back
When CGPMS is not available, which of the following maintenance management systems should you use?
A. NPMS
B. LPMS
C. CGPMS
D. Nothing
A. NPMS
When are you authorized to use LPMS?
A. When NPMS isn’t available
B. When CGPMS isn’t available
C. When NPMS and CGPMS aren’t available
D. Never
C. When NPMS and CGPMS aren’t available
Who is responsible for reviewing FBRs?
A. CO
B. EMO
C. EO
D. OPS
B. EMO
Which of the following personnel can approve LPMS for equipment?
A. CO
B. O5 or higher
C. SMEF
D. SFLC
C. SMEF
What does the acronym ACMS stand for?
A. Alternative Computerized Management System
B. Alternative Command Maintenance System
C. Asset Command Management System
D. Asset Computerized Maintenance System
D. Asset Computerized Maintenance System
How often should the tag-out log be audited?
A. Every week
B. Every 2 weeks
C. Every 3 weeks
D. Monthly
B. Every 2 weeks
How long should completed inactive record sheets shall be retained?
A. 1 month
B. 4 months
C. 6 months
D. 12 months
C. 6 months
Tag numbering shall start over on _____ of each year?
A. 01 Sep
B. 30 Sep
C. 01 Oct
D. 31 Oct
C. 01 Oct
Who is responsible for assigning you a CMPlus username and password?
A. OSC
B. PSC Topeka
C. Unit SPO
D. CMPlus administrator at your unit
D. CMPlus administrator at your unit
The CMPlus database is managed by _____.
A. NAVSEA
B. SFLC
C. OSC
D. MLC
C. OSC
The first step in performing inventory in CMPlus is to contact _____.
A. OSC
B. SFLC
C. NAVSEA
D. MLC
A. OSC
What symbol should be used to identify DoD items?
A. D
B. 7
C. M
D. 3
B. 7
Coast Guard units shall document and package unserviceable DLR items within _____ hours of receiving the replacement part.
A. 24
B. 48
C. 60
D. 72
B. 48
How many days does SFLC give the unit to return the NRFI carcass before it sends out a message?
A. 10
B. 15
C. 30
D. 45
D. 45
Which of the following choices is not a type of EMI?
A. Man-made
B. Inherent
C. Unnatural
D. Natural
C. Unnatural
Radar transmitters can produce spurious emissions from what?
A. Arcing
B. Intermodulation
C. Sparking
D. Bonding
A. Arcing
What is the transfer of modulation from one carrier to another called?
A. Intermodulation
B. Cross modulation
C. Intramodulation
D. Countermodulation
B. Cross modulation
What is the generation of numerous new frequencies from two or more signals called?
A. Intermodulation
B. Cross modulation
C. Intramodulation
D. Countermodulation
A. Intermodulation
Which of the following is NOT a type of cable?
A. Passive
B. Susceptible
C. Active
D. Inactive
D. Inactive
Which of the following choices describes a “change to form”?
A. Any change that affects an interface with other components
B. Any change that affects operational characteristics
C. Any change that affects the mission of an asset or component
D. Any change that affects the weight, balance, or movement of inertia of a component
D. Any change that affects the weight, balance, or movement of inertia of a component
What is an Operational Requirements Document (ORD)?
A. A top-level document that establishes the approval of a TCTO request
B. A top-level decision document which establishes the minimum acceptable standards of performance and optimum performance goals for an asset
C. A document submitted with the TCTO request
D. A document submitted by the Product Line Manager to enter a TCTO into the TCTO database
B. A top-level decision document which establishes the minimum acceptable standards of performance and optimum performance goals for an asset
Which form must be submitted with a draft TCTO?
A. CG-22
B. CG-25
C. CG-20
D. CG-29
A. CG-22
Any draft TCTO that proposes an improvement to an asset’s operational capability must be accompanied by a _____.
A. DD-1149
B. CG-22
C. CG-29
D. ORD (Operational Requirement Document)
D. ORD (Operational Requirement Document)
Once the Prime Unit and Product Line have started an initial validation of the draft TCTO, the Product Line Electronics Section shall update the status of the TCTO in SFLC Central Project’s database by changing the status from “Concept” to “_____”.
A. Phase 1
B. Final
C. Validation
D. Initial
C. Validation
Which type of field change furnishes documentation only?
A. Type 1
B. Type 2
C. Type 3
D. Type 4
B. Type 2
Which type of field change furnishes documentation and some of the parts?
A. Type 1
B. Type 2
C. Type 3
D. Type 4
C. Type 3
Which of the following forms can be used to document minor errors in the Field Change Bulletin?
A. Errata Sheet
B. FBR
C. CG-22
D. DD-1149
A. Errata Sheet
A Coast Guard SMEF has similar functionality to a Navy _____.
A. NESA
B. NISA
C. NSA
D. ISEA
D. ISEA
Field changes issued directly by a commercial manufacturer are _____.
A. permitted
B. not permitted
C. equipment dependent
D. sometimes authorized
B. not permitted
When should units use Local PMS? Choose all that apply.
A. When Navy PMS isn’t available
B. When CGPMS isn’t available
C. At any time
D. Never
A & B. When Navy PMS isn’t available or When CGPMS isn’t available
Who is responsible for integrating CGPMS procedures into the unit’s work schedule, and ensures compliance?
A. ETIC
B. EMO
C. CO
D. Ops
C. CO
Who is responsible for ensuring that checks and audits of all tag-outs are performed once every two weeks?
A. CO
B. Department Head
C. EMO
D. XO
B. Department Head
When asked to view incoming FLS messages in CMPlus, you should select the “_____” button.
A. Yes
B. No
C. Maybe
D. Ask me again later
B. No
After shipping a DLR item to the appropriate facility, how should the unit track the equipment?
A. ALMIS
B. ACMS
C. CGMS
D. CMPlus
D. CMPlus
After the unit receives a message stating that a DLR or MTR part is overdue, how many days do they have to send the appropriate part in?
A. 10
B. 15
C. 30
D. 45
C. 30
The following transfer of interference from an interfering source to the affected equipment is caused by _____ and _____. Choose all that apply.
A. convection
B. radiation
C. conduction
D. absorption
B & C. radiation and conduction
In order for galvanic corrosion to occur _____ must happen.
A. current must flow
B. the metals must be outside
C. overvoltage condition must exist
D. one of the metals must get wet
A. current must flow
When dealing with USCG field changes, who has the authority to provide shipping numbers for tracking purposes? Choose all that apply.
A. OSC
B. NAVSEA
C. SMEF
D. SFLC
C & D. SMEF and SFLC
What does acronym SOVT stand for?
A. System Order and Verification Test
B. System Operation and Verification Test
C. Simulated Ordnance and Variation Test
D. Simulated Operation and Variation Test
B. System Operation and Verification Test
What is the purpose of a SOVT?________________________________________________________
________________________________________________________
To verify, validate, and demonstrate that the newly installed equipment, system, or systems and all other affected systems are operating as intended.
What is the difference between an Intrasystem test and an Intersystem test?
________________________________________________________
________________________________________________________
An Intrasystem test checks functionality within a single system and Intersystem tests checks functionality within multiple systems.
The length and diameter of a typical grounding rod is _____.
A. 12 feet long by 3/4 in. diameter
B. 10 feet long by 3/4 in. diameter
C. 10 feet long by 1/2 in. diameter
D. 12 feet long by 1/2 in. diameter
B. 10 feet long by 3/4 in. diameter
Which class of bonding involves welding of two pieces of metal together?
A. Class A
B. Class B
C. Class C
D. Class D
A. Class A
When installing an earth electrode subsystem, which wire color denotes the grounding conductor?
A. Red
B. Black
C. Gray
D. Green
D. Green
Which of the following references is NOT used when inspecting a fault protection subsystem?
A. MIL-STD-188-124B
B. Civil Engineering manual
C. NEC documentation
D. MIL-HDBK-419
B. Civil Engineering manual
To protect a structure, such as a building, vessel, mast, etc… from lightning damage, the grounding cable should be _____ AWG
A. 12
B. 0000
C. 2
D. 10
B. 0000
List the primary advantage of using a floating ground subsystem.
________________________________________________________
________________________________________________________
Prevents noise that may be in the facility’s ground from being conductively coupled to the signal circuits and prevents noise currents in equipment cabinets from being coupled to the signal circuits.
What type of information is found in Section 1 of the SOVT documentation?
A. Front Matter
B. Cover Sheet
C. Introduction and Administration
D. Approval Statement
C. Introduction and Administration
Which of the following subsystems should NOT be considered an option when developing the earth electrode subsystem?
A. A series of driven rods connected with bare wire buried underground
B. A direct bond between two similar metals on top of the soil
C. A ground plane of horizontal buried wires
D. A metal piping system
B. A direct bond between two similar metals on top of the soil
Which of the following materials should be NOT when grounding an electrode?
A. Zinc
B. Copper
C. Aluminum
D. Copper-clad steel
A. Zinc
If an initial lightning strike produces 220Kv, approximately how much voltage will subsequent strikes produce?
A. 2.4Kv
B. 10Kv
C. 75Kv
D. 110Kv
D. 110Kv
Which of the following systems does NOT use a signal reference grounding system?
A. HF
B. VHF
C. LF
D. Hybrid
B. VHF
What does the term COTS stand for?
A. Custom Off The Shelf
B. Custom On The Shelf
C. Commercial Off The Shelf
D. Current On Then Shelf
C. Commercial Off The Shelf
What is the unit of measurement for illumination called?
A. Lax
B. Candle power
C. Candle hour
D. Lux
D. Lux
What is needed for the zoom or wide-angle camera to function properly?
A. Light
B. Water
C. A waterproof lens
D. Signal reference ground
A. Light
What is the life expectancy of the FDVS?
A. One year
B. Two years
C. Five years
D. Ten years
C. Five years
What is the Supply Policy and Procedures Manual (SPPM) number?
COMDTINST M4400.19
What is the Electronics Manual number?
COMDTINST M10550.25
What is the Equipment Tag-Out Procedures manual?
COMDTINST 9077.1
What is the Navy Ship’s Maintenance and Material Management Manual (3M) number?
OPNAVINST 4790.4
What is the Ordnance Manual number?
COMDTINST M8000.2
What is the manual for Equipment Tag-Out procedures?
A. 9077.2
B. 9067.1
C. 9077.1
D. 9067.2
C. 9077.1
Who is in responsible for auditing all tag-outs?
A. EMO
B. Department head
C. XO
D. Division Officer
B. Department head
What month and day should the tag numbering begin with?
A. January 1st
B. October 1st
C. Doesn’t matter
D. December 31st
B. October 1st
What regulations shall boats and cutters follow for tag out procedures?
A. COMDTINST 9077.1
B. COMDTINST 9077.2
C. COMDTINST 9067.1
D. COMDTINST 9067.2
A. COMDTINST 9077.1
What regulations must shore side units follow for tag out procedures?
A. NEC
B. NAVSEA
C. OSHA
D. Coast Guard
C. OSHA
Who integrates CGPMS procedures into the units work schedule and ensures compliance?
A. XO
B. EO
C. DIVO
D. CO or OinC
D. CO or OinC
Who provides qualified personnel to perform CGPMS and submits FBR's?
A. XO
B. EO
C. CO or OinC
D. DIVO
C. CO or OinC
Who maintains current CGPMS library?
A. LPO
B. Senior Tech
C. CPO
D. DIVO
B. Senior Tech
Who initiates requests for CGPMS revisions using FBR's?
A. Senior Tech
B. LPO
C. CPO
D. DIVO
A. Senior Tech
Who incorporates CGPMS into the unit's training schedule?
A. LPO
B. CPO
C. DIVO
D. Senior Tech
D. Senior Tech
Who schedules and performs planned maintenance?
A. LPO
B. CPO
C. Senior Tech
D. DIVO
C. Senior Tech
Who maintains CGPMS workbook, reviews and inspects CGPMS work schedules, reviews FBR's, ensures CGPMS is in the units training schedule, and briefs the CO on the status of the units CGPMS?
A. Senior Tech
B. EMO
C. LPO
D. CPO
B. EMO
Where can the CGPMS users guide be ordered from and how?
A. SFLC by a FBR or memo
B. ELC by a FBR or memo
C. MLC by a FBR or memo
D. ESU by a FBR or memo
A. SFLC by a FBR or memo
What is a step by step maintenance action (CGPMS)?
A. MPC (maintenance procedure card)
B. MRC (maintenance requirement card)
C. IMP (Index of Maintenance procedures)
D.MIP (maintenance index page)
A. MPC (maintenance procedure card)
What is a step by step maintenance action (NAVY)?
A. MPC (maintenance procedure card)
B. MRC (maintenance requirement card)
C. IMP (Index of Maintenance procedures)
D. MIP (maintenance index page)
B. MRC (maintenance requirement card)
What is an index of all applicable MPC's for a given piece of equipment (CGPMS)?
A. MPC (maintenance procedure card)
B. MRC (maintenance requirement card)
C. IMP (Index of Maintenance procedures)
D. MIP (maintenance index page)
C. IMP (Index of Maintenance procedures)
What is an index of all applicable MRC's for a given piece of equipment (NAVY)?
A. IMP (Index of Maintenance procedures)
B. MPC (maintenance procedure card)
C. MRC (maintenance requirement card)
D. MIP (maintenance index page)
D. MIP (maintenance index page)
What is a list of all CGPMS materials for electronic equipment installed at or supported by the unit, contains the total annual maintenance hours for all the listed equipment?
A. List of effective IMP's
B. List of effective pages (LOEP)
C. MIP (maintenance index page)
D. IMP (Index of Maintenance procedures)
A. List of effective IMP's
What index contains the following information; all applicable CGPMS procedures and navy MIP's?
A. LOEMP (List of effective maintenance procedures)
B. Master Index
C. List of effective pages (LOEP)
D. IMP (Index of Maintenance procedures)
B. Master Index
When do you use NPMS?
A. When working on navy type navy owned equipment
B. When CGPMS is not available
C. When working on weapon systems
D. When working on navy type navy owned equipment for which CGPMS procedures do not exist.
D. When working on navy type navy owned equipment for which CGPMS procedures do not exist.
How do you request inclusion on to the NPMS distribution list?
A. a letter or OPNAV 4790 C/K to CO, NAVSEA, code 914
B. a letter to ELC, to CO, NAVSEA, code 914
C. a letter to MLC, to CO, NAVSEA, code 914
D. a letter to SFLC, to CO, NAVSEA, code 914
A. a letter or OPNAV 4790 C/K to CO, NAVSEA, code 914
When do you use LPMS?
A. When CGPMS or NPMS is not effective
B. When CGPMS or NPMS is not available or applicable
C. When NPMS is not available or applicable
D. When CGPMS is not available or applicable
B. When CGPMS or NPMS is not available or applicable
Who has the authority to approve the use of LPMS?
A. SFLC (Surface Force Logistics Center)
B. ELC
C. SMEF (System Maintenance and Engineering Facility)
D. MLC
C. SMEF (System Maintenance and Engineering Facility)
In ALMIS what does MDL stand for?
A. Maintenance Data Logistics
B. Asset Maintenance Data List
C. Asset Maintenance Due Logistics Calendar
D. Asset Maintenance Due List Calendar
D. Asset Maintenance Due List Calendar
When would you be directed to complete a REM/INST card?
A. When a tech encounters a discrepancy that cannot be corrected by a text card, they may be directed to replace the unit
B. When a tech encounters a discrepancy, they may be directed to replace the unit
C. When a tech encounters a discrepancy that cannot be corrected by a text card
D. When a tech encounters a discrepancy that cannot be corrected by a text card, they may be directed to submit a CASREP
A. When a tech encounters a discrepancy that cannot be corrected by a text card, they may be directed to replace the unit
Where should form CG-22 be forwarded when completed?
A. ELC
B. ESU
C. MLC
D. SFLC
B. ESU
Who reviews form CG-22 before forwarding to the appropriate authority?
A. LPO
B. Unit Chief
C. The Maintenance Supervisor
D. Division Officer
C. The Maintenance Supervisor
What is a configuration change request form number?
A. OPNAV 4790 C/K
B. OPNAV 4790 2L
C. OPNAV 4690 C/K
D. OPNAV 4690 2L
A. OPNAV 4790 C/K
What blocks of the 4790c/k is it mandatory to fill in by the unit?
A. 1-6, 13-23 and signature blocks, work center supervisor
B. 1-6, 13-21 and signature blocks, work center supervisor
C. 1-7, 13-21 and signature blocks, work center supervisor
D. 1-7, 13-23 and signature blocks, work center supervisor
D. 1-7, 13-23 and signature blocks, work center supervisor
What are the three types of PMS schedules?
A. cycle, quarterly, weekly
B. monthly, quarterly, weekly
C. cycle, quarterly, monthly
D. annual, quarterly, weekly
A. cycle, quarterly, weekly
The most common type of ground rods are those made of _________.
A. steel
B. copper-clad steel
C. copper
D. aluminum
B. copper-clad steel
What size ground rods does the CG use?
A. 3/4” X 10’
B. 3/4” X 8’
C. 1/2” X 10’
D. 1/2” X 8’
A. 3/4” X 10’
Rectangular or circular plate electrodes in contact with the soil are usually buried how deep?
A. 4-6 ft
B. 3-5 ft
C. 5-8 ft
D. 6-9 ft
C. 5-8 ft
The metal framework of buildings may exhibit a resistance to earth of less than ___ ohms.
A. 10
B. 1
C. 5
D. 100
A. 10
DC resistance across bonding and grounding junctions shall not exceed ____ ohms for electrical safety.
A. 1 ohm
B. .01 ohm
C. .001 ohm
D. 0.1 ohm
D. 0.1 ohm
RF impedance across bonding and grounding junctions shall not exceed _______________?
A. 20 ohms at 30 megahertz (MHz)
B. 25 ohms at 35 megahertz (MHz)
C. 20 ohms at 40 megahertz (MHz)
D. 25 ohms at 30 megahertz (MHz)
D. 25 ohms at 30 megahertz (MHz)