Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
13 Cards in this Set
- Front
- Back
sampling should not vary by
|
more than +- 10
|
|
if sample must be taken after adding new oil, what must be done first?
|
old and new oils must be thoroughly mixed before taking the sample
|
|
what are 3 techniques for sampling oil?
|
dip tube. drain valve. pump.
-fill bottle 1/2 inch from top. -open sample bottle only when ready to take sample -close immediately after sample |
|
1.what form is used for submitting oil analysis?
|
form 2026. Can also report corrective maintenance actions.
|
|
what is the purpose for afto form 350 (repairable item processing tag)?
|
Identifies origin of item, gives key data needed to document shop actions.
|
|
what are examples of items needing form 350's (repairable item processing tag)?
|
removed engines.
removed end items. components removed from end items. |
|
what T.O. gives instructions on form 350 (repairable item processing tag)?
|
00-20-1
|
|
what is the purpose of the 2 parts on form 350?
|
Part 1- repair cycle processing tag
part 2- prouction scheduling document |
|
What is WUC Manual purpose?
|
convert words into num/alpha characters for computers to process maintenance data
|
|
What is Work Unit code?
|
Identifies system or part
|
|
Part 2 of 350 is completed by.....
|
production scheduler
|
|
when are blocks 16,17, and 18 completed by originator?
|
When item not sent to reparable processing activity
|
|
Who completes entries on reverse side of form 350?
|
RPC completes part 1.
Initiator enters date item removed in part 2. |