• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/13

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

13 Cards in this Set

  • Front
  • Back
sampling should not vary by
more than +- 10
if sample must be taken after adding new oil, what must be done first?
old and new oils must be thoroughly mixed before taking the sample
what are 3 techniques for sampling oil?
dip tube. drain valve. pump.
-fill bottle 1/2 inch from top.
-open sample bottle only when ready to take sample
-close immediately after sample
1.what form is used for submitting oil analysis?
form 2026. Can also report corrective maintenance actions.
what is the purpose for afto form 350 (repairable item processing tag)?
Identifies origin of item, gives key data needed to document shop actions.
what are examples of items needing form 350's (repairable item processing tag)?
removed engines.
removed end items.
components removed from end items.
what T.O. gives instructions on form 350 (repairable item processing tag)?
00-20-1
what is the purpose of the 2 parts on form 350?
Part 1- repair cycle processing tag
part 2- prouction scheduling document
What is WUC Manual purpose?
convert words into num/alpha characters for computers to process maintenance data
What is Work Unit code?
Identifies system or part
Part 2 of 350 is completed by.....
production scheduler
when are blocks 16,17, and 18 completed by originator?
When item not sent to reparable processing activity
Who completes entries on reverse side of form 350?
RPC completes part 1.
Initiator enters date item removed in part 2.