• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/16

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

16 Cards in this Set

  • Front
  • Back
What is Non Critical power?
Station load fed from local utility(ENEL)
What is Emergency power?
Replaces local utility during a power outage.
What is a parallel redundant system?
A system in which 2 units share the entire system load.
What is a MSG?
Main switch gear.
How many MSG's are in BLDG 440?
3
How many EDG's are at NCTS Naples?
4
Which EDG is the standby?
EDG #4
How many UPS's are at NCTS Naples?
5 total
1A & 1B
2A & 2B
2C
Upon restoral of non critical power how long before power is transferred back from emergency?
15 minutes of stable power
What is the allowed start time for the EDG's out at Lago?
18 seconds without input power.
What is the allowed start time for generators at NCTS Naples?
20 seconds without input power.
How many EDG's are out at Lago?
2
How many UPS' are at Lago?
2
How many fuel tanks and what capacity are at NCTS?
6 - 4000 gallon tanks.
How many fuel tanks and what capacity are at Lago?
2 - 4000 gallon tanks
and 2 day tanks
What is the length of UPS load service for NCTS and Lago?
15 minutes