• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back
What is the basic function and responsibility of Material Control?
Provide material support to organization, ensure material ordered is the material required and delivered to work center.
Pick up and delivery point
Establish procedures to ensure poper operation of tool room.
Prefrom OPTAR funding.
Maintain acct. of material and equip in custody.
Discuss the following OPTAR funding and give an example, Flight Operations Fund (OFC-01).
Funding for flight operations etc. fuel, flight clothing, office supplies, aerial film, flight deck boots, pubs, FD jerseys
Discuss the following OPTAR funding and give an example, Aviation Fleet Maintenace (AFM) Fund.
Funding for Aviation maintenance etc. Paint, rags, cleaning agents, consumable repair parts, hand tools, flight deck boots (maintainers only), MAFs, MAF bags, Pubs
What are the procedures for ordering parts and material?
Receive requirements from W/C, Use appropriate automated procedures to provide data to ASD, enter date time ordered in register to reflect exact time f submission, requirement for accurate NMCS start time. Approve/Disapprove indirect material requirements from w/c review mailbox at I-level
What procedures are taken when reciept and delivery of parts and material?
Recieve material and single line item requisition system documentation (DD1348).
Sign DD1348 copy as reciept.
Enter TIme and Date delivered.
Determind if component is ASR EHR or SRC card trackable.
Distribute recieved material to w/c.
Obtain signature from w/c personnel recieving material on DD1348
Turn in defective repairable CRIPL components with in 24 hours.
What are the procedures for the Turn-in of defective components?
Repairable material will be removed from A/C and made available for turn in when replacement is requested turn in with 24 hours.
All defective repairable components shall be wrapped using cushioning material, celluar film (bubblewrap) PDC-795, for Class 1, for class 2 short term protection of equipment from handling and shock when turned into supply.
ICRL
Individual Component Repair List-detailed statement IMA' component repair cpapbilities.
CRIPL
Consolidated Remain-in-Place List-listing of all authorized remain in place items which are published.
NMCS
Cannot preform any mission
PMCS
Not mission capable, can perform atleast one mission but not all
NSN
National Stock Number-13 digit stock number
NIIN
Nation Item Identification Number-9 digits, first 2 digits National code (NCB) and 7 digits conjunction wth NCB code identify NSN item
AVDLR
Aviation Depot Level Repair-
AWP
Awaiting Parts-Materials required that are not available.
IMRL
Individual material readiness list- shows items and quanities of certain SE req material readiness of A/C ground activity.
AIR
Aircraft inverntory report-formal and continous accountability for specific equipment and material installed.
EXREP
Expeditious repair- must be in support or relating to PMCS or NMCS
MILSTRIP
Military standard requisitioning and issue procedure-unifor, procedure established by DOD to govern requistion adn issue of material within stantard priorities
SM&R codes
Source, Maintenance and recoverability codes-Used to communicate maint and supplt instructions to various logistic support levels
DD Form 200
Financial Liability Investigation of Property Loss-goverment property that was lost, damaged or destroyed, document established of debt and relief from accoutability.