• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
Question
Answer
Hint
LEED is an acronym for what "green building" program?
Leadership In Energy and Environmental Design
Name the 6 categories in the LEED rating system.
Sustainable Sites, Water Efficiency, Energy & Atmosphere, Materials and Resources, Indoor Environmental Quality, Innovation and Design Process.
LEED certification is achieved through self- evaluation. (True of False)
False, third-party review for certification is required.
What is LEED NC and when should it be used.
LEED for New Construction is used primarily for new commercial office buildings & major renovations, but can be applied to all commercial buildings, including offices, retail, service establishments, institutional buildings, hotels, and residential with 4 or more habitable stories.
What is the minimum number of points to have a building certified?
26 Points
Can LEED NC be applied to Existing buildings?
Yes, LEED NC also covers major renovations. As a general rule, a major renovation involves elements of major HVAC renovation, significant envelope modification, and major interior reconciliation.
How many points does it take to reach LEED Silver?
33-38 Points
To achieve points in most categories what must first be satisfied
The related Prerequisites (pre-reqs are applicable to most categories, but not all)
Can a project be certified without satisfying all prerequisites?
No. All prerequisites must be satisfied for a project to be certified.
How many points does it take to reach LEED Gold?
39-51 Points
What rating system should be used if project scope does not involve significant design/construction and focuses more on O&M.
LEED for Existing Buildings.
How many points does it take to reach LEED Platinum?
52-69 Points
LEED for New Construction (NC) was developed as a rating system targeted at what types of projects?
New commercial construction and major renovations.
What is the first step in LEED certification of a building?
Registering the project with USGBC at www.usgbc.com, under LEED section under Register your Project.