• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back

Generally, what does AIA 102 and 103 not cover?

Applications filed before March 16, 2013

What are not considered AIA applications despite filing after March 16, 2013

A post-AIA filed continued application of a pre-AIA application or a pre-AIA PCT application that enters the national stage post-AIA

What is the treatment of claims in an application that has a mix of pre- and post-AIA claims?

AIA 102 and 103 and pre-AIA 102(g) will apply

What are the code sections saying a declaration is needed to say claims were filed under pre-AIA priority application for post-AIA nonprovisionals

37 CFR 1.55 and 1.78