Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
100 Cards in this Set
- Front
- Back
what is the fpl background and lettering if painted |
red background with 2in white letters on weather decks
|
|
how far are the frame markings to be
|
in middle of space when <14ft and every 14 ft if >14ft
|
|
What is the shell program
|
ccol program
|
|
can ccol have pen and ink changes
|
no
|
|
what color are pen and ink changes on ccol
|
not allowed
|
|
how many sections of dc book
|
4
|
|
what are the heavy lines on dc charts
|
watertight and oiltight
|
|
what are light lines on dc charts
|
air tight and fume tight and non tight
|
|
what are the dotted lines on dc charts
|
hidden boundaries, pipes, and valves
|
|
what are solid lines on dc charts
|
visible piping
|
|
what is circle william
|
vent and access
|
|
what is william
|
piping and vents
|
|
who is responsible for the darken ship bill
|
DCA
|
|
what are the closure log sections
|
violation log and ooc log
|
|
who reports manned and ready and when
|
the senior person at locker when enough people are manned to do the job
|
|
who is responsible for the battle messing bill
|
suppo
|
|
what does the dca do for the battle messing bill
|
make routes
ensure one area of ship is served at a time |
|
who decides to demolish and scuttle ship
|
CO
|
|
who is responsible for the scuttle ship bill
|
cheng
|
|
which part of the ship is the dca responsible to scuttle
|
fore and aft of main spaces
|
|
which part of the ship is the cheng responsible to scuttle
|
main spaces
|
|
NTTP 3-30.31 refers to
|
avoid detection
avoid targeting avoid getting hit minimize damage if hit dc and restoration after hit fighting hurt |
|
ship priority at war
|
fight
move float |
|
ship priority at peace
|
return to port
safety |
|
DC priority
|
fire
flood equip personell |
|
Survivability considerations
|
command and control and comms
intense heat and smoke personal casualties system restoration material stowage |
|
who is responsible for the general emergency bill
|
cheng establishes procedures
|
|
what scenarios are under the general emergency bill
|
full crew
inport partial crew cbr attack abandon ship |
|
Survivability considerations
|
1 Command and control
2 intense heat and smoke 3 personal casualties 4 system restoration 5 material stowage |
|
Responsiblity for General Emergency bill
|
CHENG
|
|
4 scenarios of the General Emergency Bill
|
full crew
inport partial crew CBR Attack Abandon ship |
|
General emergency bill is for what positions
|
Key personnel
|
|
DCA responsibilities under the General emergency bill
|
Supervise in DCC
Minimize damage assist EO in salvage ops Assist organization and training be CBR officer Everything CBR |
|
What ref and chapter covers mass conflags
|
NTTP 3-20.31 chap 10
|
|
priorities of R&A
|
rescue persons from water
assit other units in distress assist persons or activities in distress ashore |
|
MOB-D-10
|
R&A
|
|
R&A MOB-D
|
MOB-D-10
|
|
Classification of COMMS
|
Primary
AUX Supplementary (none for DC) Emergency X40J Electric |
|
JA circut
|
CO Battle curcuit
|
|
JL
|
Primary battle lookout
|
|
1JV
|
Primary man&dock / ship control
|
|
2JV-6JV
|
Supplementary eng ckts
|
|
1MC
|
General
|
|
2MC
|
Engineering
|
|
3MC
|
Hanger deck
|
|
5MC
|
Flight deck
|
|
6MC
|
Ship to ship
|
|
1 way comms
|
1MC
2MC 3MC 5MC 6MC |
|
Multiway Coms
|
4MC
20MC 21MC 26MC |
|
4MC
|
DC
|
|
20MC
|
CIC
|
|
21MC
|
Capt command
|
|
26MC
|
Macinery control
|
|
Wifcom cable also called
|
leaky cable
|
|
plates associated with comms
|
Casualty power and casualty comms
Communications directory |
|
Color of casualty comms riser on plates
|
Blue
|
|
ESP max temp
|
130 deg
|
|
ESP Discharge head
|
70ft -140gpm
50ft - 200gpm |
|
when to use ESP in tandem
|
when discharge head is over 70ft
|
|
Perijet minimum pressure
|
65psi
|
|
Perijet is how much more effective than S-type
|
7%
|
|
Perijet Max discharge GPM
|
530gpm
|
|
P-100 pressure
|
83psi - 100 gpm
62psi - 71 gpm |
|
Types of drainage
|
main
secondary gravity |
|
types of drainage actuation
|
power
gravity combination |
|
where are ovbd discharges found
|
between each main transverse blkhead
on each side of ship on DC Deck |
|
Colors of drainage piping
|
Main - green
secondary - orange |
|
Types of ventilation
|
supply
exhuast recurculation CPS |
|
Preheaters temp
|
45-65 deg
|
|
where preheaters are found
|
closest to intake of supply only
|
|
reheaters temp
|
65-80deg
|
|
where are reheaters found
|
upstream close to defusers on supply and recerts
|
|
Ventilation Plate
|
Plate 9
|
|
Types of lines and colors on the ventilation plates
|
thick - water tight
thin - non tight blue - supply red - recert orange - natural |
|
Exhaust ventilation components
|
exhuast terminal
duct work flame arrester fan weather dish screen |
|
functions of ventilation
|
introduce air
crew comfort ammo preservation electronics temp control |
|
where in DC Book is the firemain found
|
Sect II e
|
|
Firepump gpm range
|
500-2000 gpm @150psi
|
|
Firemain diagram colors
|
red- firemain
blue- sprink orange - CMWD greean - AFFF Purple - others |
|
Egress training requirements
|
within 96hrs of checking in onboard
every 6 months |
|
EEBD req found where
|
NSTM 077
|
|
req # of EEBDs onboard
|
shipwide 150%
for embarked crew 100% berthings 100% eng spaces 200% |
|
EEBD Shelf life
|
15 years
|
|
how to read casualty power
2S-4P-(2-233-4) |
2S- power source 2S switchboard
4 - 440 volt P- normal ships power (2-233-4) power panel supplied |
|
Casualty power lead #s
|
1-A
2-B 3-C |
|
Name of new type of Casualty powere
|
viking
|
|
Casualty power chart colors
|
green - permenant
red - cables blue - risers |
|
Casualty power found where
|
RPM chapt 6
|
|
Who gives permission to rig Casualty power
|
CO
|
|
who gives the source of Casualty power
|
Cheng
|
|
casualty power design features
|
preserves watertight integrity
easy to install easy to operate flexible in application interchangeable parts minimum space and weight requirements |
|
steps of first aid
|
ABC
control bleeding treat for shock treat bones transport to medical |
|
first aid actions
|
report
survey area check for response check airway check breathing check circulation stop bleeding |
|
stretchers
|
stokes
miller board (backboard) sked army litter reeve sleeve 2 |
|
stokes stretcher
|
chicken wire
|
|
miller board
|
plastic or wood board stretcher
|
|
sked stretcher
|
mummies patient
can be dragged |
|
army litter
|
canvas and poles stretcher
|
|
reeves sleeve stretcher
|
orange padded restricting stretcher
|
|
who is responsible for assigning a medical rep to DCTT
|
SMR OR IDC
|