• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/33

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

33 Cards in this Set

  • Front
  • Back

FCV 103


101


131

B-100 or 101

FCV - 100 (Air)

D-100 Secondary Reformer

E-105 A/B Waste heat Boiler

E-102 Shellside Methanation Preheater/TCV 122


8" manual vent


PI 158

D-102 Primary CO Converter H.T.S.

E-103 Converter Gas


Waste Heat Boiler

E-106/TCV-123A


Primary Waste Heat Boiler

PCV-192

MOV-132

D-105 Sulfer Guard

D-104 Secondary CO Converter

6' Manual Vent

MOV 10028

PCV 191

E-110 A/B MDEA Gas Reboiler

F-110 A/B Reboiler Seperator

E-115 Tube Side Condensate Heater

E-118 Tube Side Demin Heater

F-111 Final Seperator

JCV-310

D-106 CO2 Absorber

D-109 Water Scrubber


H2O & MDEA

PCV-155

E-101 A/B Shell Side


Methanation Heat Exchange

E-102 Tube Side


Methanation Preheater

TCV 124

D-103 Methanatior

E-101 A/B Tube Side


Metanation Heat Exchanger

PCV-156

MOV 10013

E-138 Cold Exchanger Shell side