Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
24 Cards in this Set
- Front
- Back
As a general rule, __________ measures are much more important.
a. Subjective b. Objective |
Standards
|
|
If the measurement taken by the two people are same refers to the term as
a. Reliability b. Validity c. Calibration d. Ease of Use and Simplicity |
a. Reliability
|
|
The term __________ refers the degree to which a measure actually measures what it was intended to measure.
a. Reliability b. Validity c. Calibration d. Ease of Use and Simplicity |
b. Validity
|
|
When basic quality aspects have been identified the “standards” should be defined by
a. IT Team b. Project Manager c. Quality Assurance personal d. Management e. Development Team |
?
|
|
The “standards” for the software developed using new technology should be defined by
a. IT Team b. Project Manager c. Quality Assurance personal d. Management e. Development Team |
d. Management
|
|
If the COTS software developed by the contractor which is from the another country, then the following problem arises:
a. Cultural differences b. Communication barriers c. The two words having the same name in diff. countries d. All of the above e. None of the above |
a. Cultural differences
b. Communication barriers |
|
The ‘V’ represents the following term:
1. Verification and Validation 2. Static testing and Dynamic testing 3. Black box and White Box testing 4. Software development process and Software testing process |
4. Software development process and Software testing process
|
|
Test Readiness Review is conducted by the
a. Project Manager b. Test Manager c. Quality Assurance Personnel d. User/Customer |
b. Test Manager
|
|
Acceptance testing is the ________ type of testing
a. Black box testing b. White box testing c. Shoe box testing d. Structural testing |
a. Black box testing
|
|
__________ is not the White box testing technique.
a. Condition Coverage b. Decision Coverage c. Test script coverage d. User specified Data coverage e. All of the above |
c. Test script coverage
|
|
Event identification, Risk Response are the term defined in the ___internal control
model a. COSO Enterprise Risk Management (ERM) Model b. COSO Internal Control Model c. CobiT Model |
a. COSO Enterprise Risk Management (ERM) Model
|
|
A statistical technique to assess, monitor and maintain the stability of a process.
a. Pareto Chart b. Control Chart c. Run Chart d. Cause and Effect Diagram e. Histogram |
Control Chart
|
|
Determination to continue with the software development or not is determined from the
______ a. Inspection b. In-process Review c. Phase end review d. Don’t remember other options |
?
|
|
The following is the component for the FIT
a. Data b. Structure c. People d. Rule e. All of the above |
e. All of the above
|
|
A major obstacle for deployment of wireless networks is in the
a. Standards b. Coverage c. Security |
Standards
|
|
Hand-held and internet enabled devices are example of
1. Electronic equipment 2. Wireless Applications 3. Computer devices |
2. Wireless Applications
|
|
Therapeutic listening is
a. Sympathetic listening b. Listening to pieces of information… c. Analyzing the listening of the speaker |
Sympathetic listening
|
|
Function point is a measure of
A) Effort B) Complexity C) Usability D) Size |
Size
|
|
Acceptance Testing is the responsibility of the:
A) Programmer B) Project Leader C) Independent Tester D) Assistance programmer E) User |
User
|
|
While deciding the Test tool the following factors should be considered
a. Testing for the next builds/releases after making changes b. Testing where large volumes of data is required c. Testing based on the UI interface d. All of the above |
?
|
|
Completeness can be defined as the
1. Customer says the product is ready 2. Tester says the testing is completed 3. Don’t remember the other options |
?
|
|
Auxiliary code which sets up an appropriate environment and calls the module is termed as
a. Driver b. Function c. Stub d. None of the above |
a. Driver
|
|
System boundary diagram depicts the interfaces between the software being tested and
1. Individual 2. System 3. Other interfaces 4. All of the above |
4. All of the above
|
|
The primary purpose of the interviewing is the
|
Fact-Finding
|