• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/25

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

25 Cards in this Set

  • Front
  • Back
what are the three design phases
schematic design
design development
construction documents
what factor contributes to an effective team
partnering
what are the three project conception phases
programming
planning
pre-design
this person should be retained as a special consultant by the _______
commissioning agent
owner
who validates the stages of the project and is involved from conception
commissioning agent
are schematic design documents fully developed
no
when are cost estimates prepared
at the conclusion of each design phase
who prepares cost estimates
a/e
what is the quickest and least accurate cost estimate
order of magnitude
what cost estimate provides more detailed info
assemblies/systems
materials that are relatively generic (brick, concrete, steel, limber)
commodities
basic designed products that manufacturers produce
standard products
products with non-standard characteristics
custom products
unique high performance materials without comparative competitive products
proprietary products/systems
solicitation for procurement is also known as an
invitation to bid
instructions for procurement are also known as
instructions to bidders
contractor submits his bid through bid forms/proposal forms or they are also known as
procurement forms
what is the contracting form
the agreement
division 1 is also known as
the general requirements
the transition from the bidding design phase to the construction stage is the bidding/negotiating/purchasing stage and is collectively known as
procurement
a request for compensation for dealing with a situation that differs materially from what was anticipated by the parties at the time of entering into the contract
claim
claims that cannot be resolved without intervention
disputes
type of bond that protects the owner from losing the benefit of an accepted bid
bid bond
type of bond that guarantees that if the contractor defaults, the surety will either complete the project or provide sufficient funds
performance bond
type of bond that guarantees that people working on the project will be paid
payment bond