term1 Definition1term2 Definition2term3 Definition3
Please sign in to your Google account to access your documents:
Packages requiring Special Handling
Next day Air, International ground, second day air, and 3 day select and packages that can't be scanned.
Retapes and rewraps - follow retspes procedures do not load.
Mispulls - Remove from trailer, place in designated area, T/W pickoff.
Ten load quality elements
1.Cornerstone package
2. Lock in each shelf on right.
3.Three level shelves
4.Loaded back to front at mid power zone
5. Ts no columns
6.Loaded to ceiling
7.Smalls containerized
8.Proper irregulars and smalls placement.
9.Retainer in ready position or flush with wall.
10.No over goods or damages.
Safe work methods
Lifting and loweringnever get caught in double play.
Slips and falls: maintain a stance that puts u in control.
Pushing and pulling
Need help typing ? See our FAQ (opens in new window)
Please sign in to create this set. We'll bring you back here when you are done.
Discard Changes Sign in
Please sign in to add to folders.
Sign in
Don't have an account? Sign Up »
You have created 2 folders. Please upgrade to Cram Premium to create hundreds of folders!