Consultant Drawings
|
Mechanical, Electrical and Plumbing
|
|
Home Run
|
Graphic indication that the line on the drawing connecting lights and outlets is to a particular circuit.
|
|
Points when inspections are made
|
Framing (before both sides of gyp is up), gyp. wall board construction, plumbing, mechanical, electrical and final.
|
|
Certificate of occupancy issued
|
after the final inspection
|
|
Parts of a project manual
|
bidding requirements, supplemental to bid form, contract forms, general and supplementary constructions (and technical specifications)
|
|
Bidding Requirements
|
invitation to bid, pre qualification form, instructions to bidders, information available to bidders and bid forms.
|
|
Supplemental to bid forms
|
bid security form, subcontractor list, substitution list
|
|
contract forms
|
the agreement, performance bond, labor and material payment bond, certificate of insurance
|
|
General and supplementary conditions
|
general condition of the contract
|
|
Types of specificaitons
|
proprietary, base bid, descriptive, reference standard, performance, master
|
|
proprietary specification
|
call out for a manufacturers product (most restrictive)
|
|
base bid specification (equal specification)
|
Calls out proprietary material but also allows substitution
|
|
Descriptive specificaiton
|
performance (open) - gives detailed written requirements given for the material.
|
|
Reference standard specification
|
a variation of descriptive specification which describes product or process based on requirements
|
|
Performance specification
|
sets criteria and results required for the item being specified
|
|
Master specification (Guide specification)
|
Prewritten specification that covers nearly every product
|