• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back
process of quarrying (limestone)
-long bladed diamond saw makes long cuts into solid rock
-closely spaced horizontal holes are drilled to create weakness
-rubber bladders inserted into the saw kerfs & inflated causing slabs to break away
-steel wedges are driven into separated slab causing it to split into smaller blocks
-then labeled and stacked for shipping to the mill
process of sub grade preparation
-site is cleared and grubbed
-organic top soil removed
-subsoil or subgrade is excavated to required depth
-then is graded level and compacted
-proof rolling: a heavy roller makes passes over subgrade
process of tilt up construction
-concrete wall panels are poured lying flat
-once panels have gained strength, they are lifter to final position
-tilt up reduces formwork reduces formwork costs, which can account for 50% of the cost of concrete construction
process of casting hollow core planks
-precast in casting beds 800ft or more in length
-tightly stretched pre-tensioned steel strands are strung the length of the bed and tensioned
-weld plates, blockouts, lifting loops are added as needed
-once cured to strength, the castings are cut into desired length
-then lifted from casting bad and await shipping to site