• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back
is a group of processes dureing which plans are designed, materials are brought to the site , and work is performed to build or assemble a structure
Construction
-process of adding/reparing infastructure
-includes airports, bridges, damns and tunnels
-owner is usually a gov agency
Heavy construction and infastructure
includes all single family homes apts and condos
- funded throug private investment
-low capital and labor intensive industry
Residential
Building sysyem: _____ (residential)
Modular (modular cape system)
includes gov buildings and schools hospitals malls
-labor and material intensive
-funded through public and private investments.
Commercial
power plants, auto plants, and other plants
-undertaken by large construction firms due to their high technical needs
-can be funded by gov or private firms
Industrial
Who has responsibility for building material selection?
depends on contractual agreements. Often designer/architect with input from owner for appearance and performance and contrctor for cost and availability
Zoning ordinances are usually imposed by whom?
local authorities
What is the primary focus for building codes?
protect against fires
___ and ____ are models for most US local building codes.
IBC / IRC
What building code?
- 3 stories max height
-townhouses
-one and two family homes
IRC
What building code?
-all building types except those covered by the IRC
IBC
IBC resistance to fire
Type I is____ / Type VI is ____
More resistance/ Least resisitent
Fire resistance is measure in ______ and increased fire resistance usually means _____
Hours/ Increased construction costs
________ are occupancies with great hazard and less resistant to fire
Smaller buildings
outline for construction specs
-numbering system for the organization of construction materials and systems
-50 major divisions (LIKE STATES)
-often used by contractors for construction cost coding
Construction Specifications Institute (CSI)
Provididing Construction Services
-_____ a finished product that meets its functional requirements and its expectations for design and quality at the lowest possible cost and on the predictable schedule
OWNER
Providing Construction Services
-_____ quality work, earn a profit, and complete the project in a timely fashion
CONTRACTOR
Other project delivery forms

______: combines aspects of construction manager with genreal contractor
CM at risk
Other project delivery forms

_______: provides financing as well as contruction services
Turnkey construction entity