Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
5 Cards in this Set
- Front
- Back
POHR |
Estimated overhead/estimated quantity of allocation base |
|
Applied Overhead |
Actual use of allocation base x POHR |
|
Allocation base |
Measure such as machine or direct labor hours used in POHR |
|
COGm |
Beg WIP + DM + DL +Applied OH - End WIP |
|
Unadjusted COGs |
Beg FG + COGm - Unadjusted Cogs = End FG |