Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/39

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

39 Cards in this Set

  • Front
  • Back
Ext walls req'd to prevent __ & to drain water that __
water accumulation / enters the wall assembly
__ membrane req'd over studs or sheathing.
Waterresistive
All penetraions req __ to carry water to ext or to water-resistive membrane.
flashing
Stucco - __-coat system req'd EXC __-coat system OK over masonry
3-coat / 2-coat
Weep screed (stucco flashing) min __ to earth, __ above paving.
4in / 2in
Minimum __ layers of grade __ paper or equivalent
2 / grade D
The stucco coats are: (from stud to the exterior)
Scratch, Brown, Finish
On a stucco weep screed where does the water exit?
water exits from edge of screed NOT through the holes.
Total thickness of stucco wall from sheathing min __
7/8in
EIFS - Water-resistive barrier & drain plane req'd behind insulation (only __ systems allowed)
water managed
What is not allowed to be nailed through EIFS
Decorative trim
EIFS - Terminate at least __ above ground level
6 in
Fiber cement horiz lap siding end joints require __ or __
caulk or H-clips
Panel siding horiz joints __ or __ (__-bar)
lapped or flashed (z-bar)
Max height for masonry veneer
30 ft
Min __ gap between top of veneer & structural frame
3/4in
Metal ties max __ horiz & vert spacing
24in
Min __ weepholes immediately above flashing
3/16in
Weepholes max spacing __ O.C.
33in
Min __ air space between sheathing & veneer OR mortar/grout fill over water-resistive membrane
1in
Attics >= __ high req access
30in
Opening min __x__ & __ headroom
22in x 30in & 30in
Opening must allow __
removal of attic mechanical equip
__in to __in mesh screen over openings
1/8in to 1/4in
Min net opening area __th of vented area OR __th if 50%-80% in upper portion.
1/150th or 1/300th
Insulation min __ clearance to sheathing near vents
1in
Wood panels req grade __ & __
grade stamp & span rating
Nail to schedule (__in edge - 12in field min)
6in edge - 12in field min
__in gap on sheathing marked "sized for spacing"
1/8in
Min __ ice-dam membrane from edge to 24in inside ext wall line of bldg in areas with history of ice forming at eaves.
24in
Asphalt shingle min slope __ & __ if <4:12
2:12 / double underlayment
Asphalt shingle fasteners min __, min __ into sheathing (or through if sheathing <3/4in)
4in / 3/4in
16in wood shingles min slope __ (__in max exposure if <4:12)
3:12 / 3.75in
Wood shakes min slope __
3:12
Clay/concrete tile min slope - __
2.5:12
Chimney cricket req'd AMI or if chimney __ wide.
>30in wide
Built-up roofs min slope __ vert to __in horiz
1/4" vert / 12" horiz
What is req'd 2 in above low point of roof.
secondary drains
min Chimney height
3ft above roof / 2ft higher than anything within 10ft