• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

Preheating

Heat parts before welding in special oven or furnace at 80-230* C

Post weld treatment

Heating parts after welding has been completed .(590* C or above). N cooling slowly at controlled rate until temp drop to below 315* C

Riveted joints

No longer used . 2 main types of riveted joints are Lap joint n butt joint .

Tapered mandrel

Fits between the roller and when mandrel is turned the roller are rotated and forced out against the tube wall thus expanding tube against then tube hole

Boiler stay

To support large flat surface to prevent it from bulging under pressure,of tube sheet waterleg and crown sheet of firetube boiler.and water boiler don't need stay bcs they dnt have large surface .type Diagonal ,longitudinal,staybolts.

Manhole size

Elliptical manhole 12 in x 16 inch


Circular manhole 15 inch dia.


Hand hole 2.75 inch to 3.5 inch (70-89 mm)


They shall be rolled forged or cast steel except pressure less then 250 psi and temp 450 df and made of cast iron.

Foundation n support required

To avoid any movement to reduce induced stress on boiler and its connecting pipe work.strong concrete foundation is required .bottom n top supported .