• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/33

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

33 Cards in this Set

  • Front
  • Back

When is stage 1 entry control implemented

Whenever ba wearers start up and requires ecp est

Siting an ecp x8

1.size of inner cordon 2.location of access points 3.levels involved height size of building 4.wind direction 5. Run off 6. Development of incident 7.distsnce from scene 8.air quality

Ecp is set up on perimeter of inner cordon to x3

1 control entry exit of wearers


2monitor safety if wearers


3 respond to an emergency

Eco responsibilities x5

1 wear eco jerkin


2 collect tallies 3correct ppe ba worn


4.ba emergency team available


5.organise relief teams

Minimum Re entry pressure

9ltr 110


6.8 or twins 150

When to call a mayday

Lost,trapped, in trouble .


Eg entrapped,fall through structural elements ,low air, can't find an exit ,adverse change in ff conditions

Who can declare a mayday x3

1 those endangered 2 any crew that sees someone in danger


3. Ic or eco unable to account for crews

Who can declare a mayday is over

Ic

Who replies to a mayday and what do they say

Eco and pass your mayday who what where

What should you do if you transmit a mayday

Mayday x3 to eco


Eco replies


Mayday name situation location cylinder pressure

You hear a dsu and no mayday has been called . What do you do ?

1.notify eco.


If you can't contact ba teams or investigate

What are eco actions on a mayday

1.pass your mayday who what where


2.start up emergency team


3.await tasking from Ic or sc


4insert tallies in bottom two slots

When should mayday be declared by eco x3

1.advised or aware of dsu and unable to contact crew


2.crew is overdue it's tdo and unable to contact


3.another crew informs you of dsu and unable to contact

Sudden air loss procedure x4

1.check cylinder valve 2.operate supplementary air . activate dsu


4. Exit to ecp

When is stage 2 ecp to be est x4

1.6 or more ba crews 2. 3 or more entry points


3.oic deems it 4. Guidelines maybe used

Who is appointed at stage 2 ba

BASO

What other duties can BASO perform

None

Ancillary equipment x4

1.torches 2. Personal line 3. Pouch 4.guideline

How long is a personal line and guideline

Personal line is 5+1=6m


Guideline 60m

Maximum amount of guidelines under eco

2 and labeled A and B

When to use a main guideline x3

Hi ex foam


Large complex structures


When a structure is flooded or likely to be

What are the routine tests x6

Visual, function , hp , lp, battery , weekly

Minimum ba pressure

300 =240


200= 170

What is an irrespirablle atmosphere

Atmosphere that cannot be breathed by either o2 deficiency or presence or poison or irritant

Which instruction should should ba wearers follow

Ba oi E3-2

9 attributes of ba wearer

1.mental self control 2.confidence 3.fitness 4.teamwork and spirit 5.communication skills 6.alertness 7.concentration 8 knows signs and symptoms of heat illness 9. Training

When should a set be impounded

When set failure or or potential failure may compromise wearer

I'm pounding procedure used whenx3

Sudden air failure


Component fitting or connection failure on set which effects air supply


Injury occurs ba set contributing factor

What is the I'm pounding procedurex7

Assess injuries and treat. Notify oic.trainer or safety oic.


Do not tamper with set e.g do not reset first bret only close cylinder of need be


Defect label seal in bag and sent to ba hub


Fill out e3-2


Fill out a report send to am


Report occurrences and and complete accident form

Underwater use of ba depths

Technically 4m do not attempt anything greater than 2m

What to do once a ba set is used underwater

Withdrawn from service and labeled sent to a ba hub.


Leave cylinder on ldv reset.ensure cleaning of dirty set applied

Cleaning dirty mask.

Use 60ml of safety wash for ever 9l of water or 200ml safewash to 800mlwater.. process is rinse disinfect min 1min no more than 10


Rinsdry

Cleaning of a very dirty set policy.

Reset ldv and charge set


Clean mask


Rinse charged set under water.dont let into ldv


Wash with safety wash


Rinse


Press ldv to clear water then turn off