• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back
When can a QA inspector sign off grounding discrepencies and/or flight control work if they are not a primary QA?
when approved by a supervisor possesing maintenance release authority.
What are the three factors that contribute to FOD?
Poor housekeeping, poor maintenance practices, carelessness
What is JOAP responsible for?
The determination of wear metal concentrations in the lubricating fluid.
What is the MIL SPEC # for fuel system icing inhibitor?
MIL-DTL-85470B
Introduction of icing inhibitor will lower the flash point of jp-5 by how many degrees?
by 4 degrees
In what manual can the corrosion control program be found?
PG-85-00-60
Who shall manage the coast guards TEMPEST program?
ALC. as directed by CG-41
How long is an AVGFET certification valid for?
1 year
What form is used to make changes to the authorized chemical use list?
CG-22
Who can authorize a one time purchase of a chemical not found in the authorized chemical use list?
the EO
The electrolyte level must not be adjusted until the battery has been charged and allowed to sit for how long?
2 hours
When checking the battery temperature the case reaches 115F what should be done?
it may be necessary to add water to the affected cells or discontinue charging until battery cools.
To eliminate the possibility of damage by electrostatic discharge, all maintenance
personnel should utilize what?
a personnel ground device.
A personnel ground device consists of what?
a conductive bracelet, 200K ohm resistor, a length of #20 standard copper
insulated wire and a clip/clamp, connected in series and attached to an adequate
“ground
Harmful effects from industrial solvent exposure come principally from...?
inhalation of vapors and skin contact
All static grounds will have resistences of less than how many ohms?
14,000 ohms
How often will existing static grounds be tested and IAW what manual?
14 months and MIL-HDBK-274(AS)
With a fuel spill of 18 inches or less, ramp personnel shall do what?
stand by until aircraft is dispatched.
With a fuel spill of 10 feet or less in any dimension or 50 square feet or less what shall ramp personnel do?
have a fire guard posted, up wind, with a foam-type or
Halon-type fire extinguisher until the area is inert and purged
Fuel spills over 50 square feet or continous shall be....?
reported to
the supervisor in charge, who shall notify the airport or local fire department to inert
the spill. Anyone in the spill area shall leave at once.
What is the number for the Hazardous Waste Management manual?
COMDTINST M16478.1
What is the number for a serviceable tag?
DD-1574
What is the number for a unserviceable (repairable) tag?
DD-1577-2
What is the number for a Unsatisfactory report?
CG-1577-A
Who conducts a monthly check of all aircraft log books?
the EO
What does an ACMS configuration report list?
All serial number tracked components on aircraft or major assembly
What does the absence of a serial number for a particular component indicate?
the component is not installed in the data base and
required maintenance is not being scheduled against it.
As a minimum, how often shall a new MDL be printed?
Once a month. and it should have calender and hourly tasks for a two month period.
what is the color of the pre mission and servicing record?
Yellow
What is the color of the flight record?
blue
What is the color of a flight generated maintenace record?
Pink
What is the color of a flight safety maintenance document?
Pink
Paper logbook forms will be used when non-connectivity exceeds how many hours?
4 hours
How long are paper form logbooks retained for?
90 days
All deferred maintance actions shall be authorized by who?
the EO or whoever he has appointed.
With the exception of deployed aircraft, no deferred discrepancies shall remain open for a period longer than how many days?
30 days and the approval of the EO or their designated person.
Aircraft engines, high value components, items requiring special configuration control procedures, items in ciritcal supply and of sufficiently high cost are what type?
Type 1 materiel
aeronautical materiel, less avionics for which ALC has servicewide support responsibility. Unit price of $250 or more, procured from a commercial source of supply, flight critical, repairable. what type is this?
type 2 materiel
Consumable aeronautical materiel, less avionics, with a unit price less than $250 and procurable from an OGA source. what type?
Type 3 materiel
Avionics materiel for which ALC has servicewide support responsibility. Unit price of $800 or more, procured from a commercial source of supply, flight critical, repairable. what type is it?
Type 4 material
Consumable avionics materiel with a unit price less than $800 and procurable
from an OGA source. Units set their own allowance quantities and procure material
using unit AFC 30 funds
Type 5 material
Aeronautical Support Equipment (SE): For items costing more than $250 but
less than $2500 ALC will provide initial provisioning but will not provide subsequent
replacement or repair
Type 6 material
Material used to support the Turbomeca Arriel 2C2 CG engine.
Type 7 material
Unit price of $2500 or more, Difficult to procure through OGA or commercial sources, Critical support item, ALC managed Depot Level Repairable (DLR) program, Reparables beyond unit capability and funding of $2500 or more
Type 8 material
Priority 2
requisitions are selected for what type of shipment and will be filled as long as there are parts on the ALC shelf
immediate shipment
Priority 5 requisitions will be filled if there are more than how many parts on the ALC
shelf?
2 parts
Priority 12 requisitions will be filled if there are more than how many parts on the ALC shelf?
5 parts
Materiel shall be shipped to ALC or other designated repair facility with the
appropriate documentation within how many days of removal from service?
15 days
What is the maximum amount of days you can wait before shipping an item back to ALC?
30 days.
For Preservation, Packaging, and Packing of Military Supplies and Equipment you should refer to what manual?
NAVSUP PUB 503