• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/19

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

19 Cards in this Set

  • Front
  • Back
retained earnings
bs
capital stock
bs
cash
bs
a/r
bs
notes payable
bs
materials-construction
is
labor-construction
is
long term liability
bs
a/p
bs
equipment construction expenses
is
overhead expenses
is
buildings
bs
accumulated depreciation
bs
construction revenue
is
interest income
is
billings in excess of cost/profits
bs
cost in excess of billings/profits
bs
sub contractor construction
is
equipment
bs