• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/70

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

70 Cards in this Set

  • Front
  • Back

Cat lube tank capacity

220 Gal

Lubrication circuit is actuated during what phase

During military power

S580

Actuates both switches at 750 psi

LV stroke timer clocks reset to zero at what phase.

Final ready

S581

3 1/2 xhead movement

S582

9" xhead movement

Metering injector ball check valve spring loaded to

200 - 250 LBS

ICCS panels

Left wedge - go / no go, cat interlock


Intermediate slope - night light push buttons


Lower center - push to test switch

Sealing strip tensioner

14 1/4 +/- 1/4

Tow test cold/hot

1500 lbs / 2500 lbs

One count on the CSV counter is equivalent to ( ) axial movement of the spindle.

0.01 inch

Range of CSV

020 - 320

CSV set relay

R36 energized

LPL solenoid energizes during what phase

Final ready

Sealing strip guide max dimension

1.413 "

Shuttle reading for replacement of connector

3 or more exceed 1.885 " replace connector

Shuttle reading for depot level disposition

Any dog thickness less than 0.908

Max shuttle reading

1.905

Shuttle inspected every ( ) shots

1200

Max spacer to strip guide gap

0.010

Max rebuilt segmented seal permissible clearance

0.030

WB Elbow pressure

58 - 65

WB discharge

65 - 105

WB pressure switch

50 +/-2


55 +/-2

NGL tracks

AP-


BC-


ASA-


FSA-


FT-

Booster pump filter is replaced when

Pressure drop of 25 psi or more

Booster pump discharge pressure

50 psi

Ret engine stuffing box switches

S581 SA


S582 SR


S583 EA


S589 EF

Solenoids for raising and Lowering JBDs

A - raise


B - lower

Shuttle can not remain in battery for longer than

5 mins

Stress welding is

975+/- 25 for 1 hr

Cable tensioner accumulator pressure

Pre charge - 450 psi


Operating - 900 psi


Relief valve - 960 +/- 50

Proper grab dynos

4000 +/- 250 psi


(3750 - 4250)

Bridle tensioning relief

225 +/- 50

Cat sheave size

9"

center cylinder in buffer assembly

Soild rod , provides automatic retract slide assy

2 outer cylinders in buffer assembly

Hollow rod, provides fluid resistance for deceleration of A/C

Shock absorber in buffer assembly

Provides uniform deceleration to prevent damage

Buffer accumulator pressure

Pre charge : 200 psi


Operating: 250 - 300 psi

JBDs mod 0/2

6 panels per jbd, 3 operating gears

JBDs mod 1

4 panels per jbd,2 operating gears

JBD fluid pressure

90 - 110 psi

JBD max temp

210 °f

JBD raising speed

6 seconds

Cat phase colors

Cat rdy - white


Mil power - green


Final ready - red


Fire - red

DCU flow rate

59 - 73 Gals/min

DCU spring rate

200 lbs

DCU relief valve

3100 +/- 50 psi

Main hydraulic accumulator capacity

45 Gal / 6 cubic feet

Air flask capacity

70 cubic feet of air at 2500 psi

Full LV xhead travel

15 inches ( only during maintenance)

CSV encoder max difference

+/- 1

Steam pressure cutoff switches

Close at 20 +/- 1 psi


Open ar 10 +/- 2 psi

Pressure breaking orfice elbow

3/4 (.750)

Max difference between elongs

1"

Launching pistons weight must be with in

10 lbs of each other

Top 3 segments seal gap in the.

Cylinder cover

6 segments seal the gap created by the

Cylinder slot

Shuttle has how many sweeper plates and roller

2 & 8

Number of lube injectors per cat

54

WB capacity

5000 Gal

WB operating temp

40 - 180°f

An increase in elbow pressure may indicate a clogged

Annulus ring

A decrease in elbow pressure may indicate a clogged

Honey comb strainer

WB proper suction

0 - (-10)

DESI readout

Date


time


Shot count


Endspeed


CSV setting

Rotary ret engine motor speed

600 rpms

4 rotary ports

Advance


Retract


Purge line filter


Lube drain port

Rotary 3 gears

Drum


Idler


Screw

Dump valves actuate at

75 ft fully fwd / aft