• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

Construction, operation, reclamation of a pulp, paper, newsprint fibre mill w/ capacity of:

> 100 TONNES/DAY

Construction, operation, reclamation of a quarry producing:

> 45000 TONNES/YR

Construction, operation, reclamation of a dam greater than ___ in height when measured to the top of the dam

15m

Construction, operation, reclamation of a water diversion structure and canals w/ capacity of:

> 15 m^3/s

Construction, operation, reclamation of a water reservoir w/ capacity of:

>3 million m^3

Construction, operation, reclamation of A TOURISM FACILITY EXPECTED TO ATTRACT MORE THAN _______ VISITORS/YR + WILL BE IMM ADJACENT TO AN ECO RESERCED/NAT AREA/WILDERNESS AREA UNDER THE WAERNA ACT

250 000

Construction, operation, reclamation of a surface coal mine producing:

greater than 45 000 tonnes/year

Construction, operation, reclamation of a commercial oil sands, heavy oil extraction, upgrading/processing plant producing ____ of crude bitumen/derivative

> 2000 m^3/day

Construction, operation, reclamation of thermal electric, hydroelectric power plant w/ capacities of:

> 100 MW

Construction, operation, reclamation of a sour gas plant emitting:

> 2.8 tonnes of sulfur/day