• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back
Plan Scope Management

Output


1. Scope Mgmt Plan


2. Requirement Mgmt Plan





What are the components of the Scope Mgmt Plan?

How:


1. To develop and structure the project scope statement


2. to Enable the creation of the W.B.S from the scope statement.


3. The WBS will be maintained and approved


4. Formal acceptance be will obtained


5. Change Requests will be processed

What are the components of the Requirements Mgmt Plan?


(Referring to stakeholder requirements)

1. How requirements activities will be Tracked, Reported, and Planned.


2. How configuration mgmt. (Changes) will be tracked, reported and I.D


3. How to define & prioritized the requirements.


4. How to measure the product


5. How the detailed attributed of the tractability matrix will be tracked.

What is the scope mgmt. plan and what is its key benefit
The scope mgmt. plan is a plan for how the project scope will be defined, tracked and managed throughout the project from all aspects. It provides various directions.