Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/17

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

17 Cards in this Set

  • Front
  • Back

WHAT PART OF VIDS/MAF COPY 1 DAILY AUDIT REPORT CONTAINS ALL RECORDS SUBMITTTED DURING THE CURRENT REPORT PERIOD WHICH CONTAIN ERRORS WHICH HAVE NOT BEEN CORRECTED?

PART 2.
WHAT SYMBOL IS USED IMMEDIATELY UNDER THE ERRONEOUS FIELDS (MISTAKES) ON A VIDS/MAF COPY 1 DAR?
(*) ASTERISK.
WHAT IS A (MDR-2)?
MONTHLY PRODUCTION REPORT.
AN (MDR-2) PROVIDES STATISTICAL INFORMATION ON A PARTICULAR WORK CENTER FOR WHICH POSITION IN A DIVSION TO ANALYZE?
WORK CENTER SUPERVISOR.
MDR-2 PROVIDES WCS WITH STATISTICAL INFORMATI0N PERTAINING TO THE WORK CENTER WHICH INCLUDES WHAT 9 PARTS?

1)Troublesome subsystems are indicated by a large number of maintenance actions.
2)Repeat discrepancies by BU/SERNO are noted.
(3) Man-hours expended for each subsystem can be readily iDENTIFIED. (4) Lack of training or test equipment is indicated by the number of no defects or cannibalization actions for a subsystem.
(5) A comparison of JCN and action date gives the relationship between days and man-hours required to complete a job.
(6) Part numbers of parts/assemblies.
(7) Repetitive parts problems are shown for a given subsystem.
(8) The efficiency of inspection procedures and specific equipment peculiarities can be evaluated by comparing when discovered code totals to the total number of discrepancies.
(9) TD actions are indicated by the TD number of each subsystem.

WHAT IS A (MDR-3)?
JOB CONTROL NUMBER CONSOLIDATION REPORT.
WHAT IS A (MDR-4)?
TECHNICAL DIRECTIVE COMPLIANCE REPORT.
WHAT IS A MDR-5?
MAINTENACE ACTION BY SERIAL NUMBER REPORT.
WHAT IS A MDR-6?
MAINTENACE ACTION BY SYSTEM AND COMPONENT AND COMPONENT REPORT.
WHAT IS A MDR-7?
COMPONENT REPAIR/BEYOND CAPABILITY OF MAINTENANCE REPORT.
WHAT IS A MDR-8?
FAILED PARTS/PARTS REQUIRED REPORT.
WHAT IS A MDR-9?
REPAIR CYCLE DATA REPORT.
WHAT IS A MDR-10?
FOREIGN OBJECT DAMAGE REPORT.
WHAT IS A MDR-11?
CORROSION CONTROL/TREATMENT REPORT.
WHAT IS A MDR-12?
NO DEFECT REPORT.
WHAT IS A MDR-13?
WHEN MALFUNCTION WAS DISCOVERED REPORT.
HOW MANY MDR'S ARE THERE?
13.