67 Cards in this Set

  • Front
  • Back
What does 3M stand for?
Maintenance
Material
Management
What are Two Parts of 3M?
PMS
(Planned Maintenance System)
MDS
(Maintenance Data System)
What 3M Manual do we use?
OPNAVINST 4790.4C
What does the # sign mean?
Mandatory Related Maintenance
What does an “O” Mean?
Maintenance Check Lost
What does --- Mean?
Denotes Changes or Additions
What does “Y” mean?
Yes, Parts are required
What does “N” stand for?
Parts not Required
What does “X” stand for?
Maintenance Check is Complete
What is on the LOEP
(List OF Effective Pages)
List of MIPs
(Maintenance Index Page)
What is on the MIP?
(Maintenance Index Page)
List of MRCs
(Maintenace Requirement Card)
What Manuals do we use?
3M
OPNAVINST 4790.4C
Safety Manual for Forces Afloat
OPNAVINST 5100.19D
HAMAT
HMUG/MSDS
What does SPMIG stand for?
Standard PMS Maintenance Identification Guide
(It is a code on a MRC used to find a suitable replacement for a piece of test equipment).
To who do you report any discrepancy about your maintenance?
Work Center Supervisor (WCS)
How Often does the WCS audit the Red Tag Logout?
Daily
TAGS
Yellow- Caution
Red - Danger (Departmental
Work Center)
What are the 3 4790/ forms?
4790/2K- Maintenance Attack Form
4790/2l- Supplemental Form
4790/CK- Configuration Change Form
Who is the functional manager and responsible for the coordination and direct supervision of all administrative facets of the 3-M system?
3-M Coordinator
What are the three scheduling boards utilized for PMS?
Weekly, quarterly, cycle
Who is the 3M manager?
Executive Officer
Under which of the following circumstances should the workcenter supervisor be promptly notified?
-When there is anything on the MRC that you do not fully understand
-When any tools, parts or material listed on the MRC are not available
-When any doubt exists about your ability to properly perform the maintenance check
What does the acronym I.E.M. stand for?
Inactive equipment maintenance
Who reviews the weekly schedule?
Division Officer
Where do you look to find your daily PMS assignments?
Weekly PMS board
What instruction governs the 3-M system?
OPNAVINST 4790.4C
Who screens, serializes, dates and maintains control of all feedback reports?
3-M Coordinator
What form is used to document a deferred maintenance action?
4790/2K
Submitting a 4790/CK for a newly installed piece of equipment will initiate support to include?
-PMS
-Technical manuals
-Cosal support
How is an urgent feedback report sent out?
Naval message
What action should you take after completing a PMS requirement?
Inform your workcenter supervisor
If a MRC requires a PMS tag out, what document should be attached to the MRC?
Tag guide list
Who may authorize danger/caution tags
Anyone authorized by the Commanding Officer.
While performing maintenance checks, you discover an unsafe procedure on the MRC. After informing your workcenter supervisor, what should be submitted?
Feedback report
When you complete a maintenance requirement, can you “X” it off on the weekly schedule?
No, only the workcenter supervisor
How do you change an incorrect MRC?
Submit a category A feedback report
On the weekly boards, what day does the week start on and end on?
Monday to Sunday
Using the MRC syscom control number (48 XDST N), what does the 48 mean?
April 1998
What color is a Technically validated MRC?
Yellow
What color is a Preliminary MRC?
White
What color is a Classified MRC
Pink
Which PMS check should be conducted at least once every three months?
Q-1
What document describes step-by-step procedures for performing a maintenance action? (3-12)
MRC
You go to the MRC deck to get your maintenance card and it is not there. What do you do?
Immediately inform your workcenter supervisor
What does the “R” mean in M-1R?
Situational Requirement
Who is overall responsible for the 3-M system?
Commanding Officer
When hanging authorized danger tags who will accompany you?
No one.
For a danger/caution tag posting, what does independent review mean?
The checker shall not accompany the person(s) posting the tag.
What is the only block of the MRC that can be changed by maintenance personnel?
none
Which of the periodicity codes fall under I.E.M.?
SU - Start-up
What is the source of general safety precautions for forces afloat?
OPNAVINST 5100.19D
For the MRC syscom control number 24 DWYG Y, what does the “Y” mean?
Repair parts are required to perform the MRC
What is to be done with the tag-out record sheet after tags are hung and independently reviewed?
Kept in the work-center until time to clear.
What is the purpose of the 3-M system?
To provide for managing maintenance and maintenance support to help achieve maximum equipment operational readiness
If the maintenance check can be performed by memory, the MRC is not required.
False
Which supplemental form is used to provide amplifying information (such as drawings and listings) related to a maintenance action reported on an OPNAV 4790/2K form?
4790.2L
An outdated piece of equipment is removed from your workcenter. What 3-M form should be submitted?
4790.CK
What code on a MRC is used to find a suitable replacement for a piece of test equipment?
SPMIG
Where can you look to find a brief description of a MRC?
Maintenance index page
What two pages are necessary for you to verify a MRC?
LOEP and MIP
MIP
index of a complete set of MRC’s applicable to a system, subsystem or equipment.
EGL
Used with a controlling MRC when the MRC applies to a number of identical items.
LOEP
Provides a listing of the MIP’s and system equipment not requiring PMS assigned to each work center
TGL
Contains the information necessary for equipment tag-out incidental to PMS accomplishment
How often would a MRC M-2 be performed?
Every other month
What manual do we use for HAZMAT?
HMUG -Hazardous Material User Guide

MSDS- Material safety data sheet
IGL final reviewer is
Department head
What are the letter periodicity codes:
A- Annually
S- Semi annually
Q- Quarterly
M- Monthly
W- Weekly
D- Daily
R- as Required (situational requirement)
U- Unscheduled Maintenance
LU- Lay-Up Maintenance
PM- Periodic Maintenance
SU- Start-Up Maintenance