• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back
Residual Risk
Passively accepted risk.
Contingency Plans
Action taken if an opportunity or threat is identifid
Fallback Plans
When Contingency Plan A fails, resort to plan B
Risk Owners
Assigning someone to own the risk
Secondary Risk
Risk generated as a result of a planed risk response
Risk Triggers
Warning signs to the risk owner to take action
Contracts
Reviewed by the project manager to identify risk and determine that risk has either been succesfully avoided, mitigated, transfer, exploited, Enhanced, Shared
Risk Appetite

Generalized high level acceptance of risk.


"Little Risk" Little Appetite

Risk Tolerance

Measurable acceptance of risk.


"Accept risk within this range" Tolerate so much salt

Risk Threshold
Risk Breaking Point. No More. Not accepting this risk if it reaches this point.
Risk Averse
Does not want risk at all. Far extreme