FMEAs were originally used in the engineering industry during new product design (Mulligan & Nechodom, 2008, p. 662) and over time were adopted into healthcare to reduce potential harm to patients.
“FMEA involves a multidisciplinary team mapping out a high-risk process of care, identifying the failures that can occur, and then characterizing each of these in terms of probability of occurrence, severity of effects and detectability , to give a risk priority number used to identify failures most in need