Boeing 777

Great Essays
This Engineering Authorization (EA) is issued to incorporate______. Currently, the Boeing 777’s rubstrips, located where the fairing meets the strut, do not have any wear limits. These rubstrips have been found to be very worn when they have been inspected, in some instances up to almost 80%. This EA is being created to establish a set of guidelines for when it is necessary replace these rubstrips. By creating this EA, it will allow us to also start creating wear limits on these rubstrips. This EA affects all s-CAL and s-UA 777 aircraft.
Action
Operation 1: Determining the wear on the rubstrip located on engine 1
1. Gain access to where the fairing and strut meet
2. Locate and identify the rubstrips
3. Measure any wear found on these rubstrips
4. If
…show more content…
Locate and identify the rubstrips
3. Measure any wear found on these rubstrips
4. If wear is found, replace the rubstrip
R&R T of A
During the aircraft’s next C-check these rubstrips should be replaced. This EA is not time controlled. All operations must be accomplished at the same C-check.
Tech Substantiation
This EA creates a set of guidelines for replacing rubstrips on the 777. These rubstrips are located at near where the fairing and strut meet. The rubstrips are meant to protect other components of the aircraft from being damaged. When these rubstrips wear down, they can expose other components of the aircraft to damage, which could create a more costly issue to deal with. Currently, there are no wear life rates in place for these rubstrips. By checking on the rubstrips at the aircraft’s next C-check, it will allow for wear rates to be calculated.
Risk assessment
A risk assessment was performed per GMM 06-15-05 and the SMS manual. The risk classification for the inspection of these rubstrips shows limited risk. This area will be inspected per this EA and if damage is found it will be repaired prior to further flight. AD marking was considered but would be of no value.
Steps
Operation 1
Access

Related Documents

  • Improved Essays

    The informative section of my ad shows students that this…

    • 1152 Words
    • 5 Pages
    Improved Essays
  • Decent Essays

    Todd Heller, Inc. v. Indiana Department of Transportation In early 2001 Indiana Department of Transportation (INDOT) entered into a Quantity Purchase Award agreement with Heller, Inc. Heller, Inc. is a Pennsylvania corporation. The agreement was for Heller to manufacture and distribute glass beads to INDOT’s various districts throughout the state of Indiana. (Glass beads are tiny spheres, which are mixed into traffic paint to create a reflective property.)…

    • 521 Words
    • 3 Pages
    Decent Essays
  • Decent Essays

    The new MAT BHH is processed in QA8 except the planning order information. I have send a request to IT to update the MAT BHH with the given Planning Order and CC. Once the request is processed by IT I will let you know. I am still waiting to receive the Job Owner info and please line up the tester to perform UAT in QA8.…

    • 65 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    P-51 Mustang

    • 1016 Words
    • 5 Pages

    I don't know much about the P-51 Mustang but i do know a little bit. For a first I know that the P-51 mustang came into play during WW2. The P-51 Mustang was a very popular design of aircraft for the U.S.. this design was good because it was very fast and aerodynamic.…

    • 1016 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Observed four PTs perform Pre-operational checks per PX-2977. The Process Engineer, two PSMs and Defense Board were present for the operation. The PTs performed ED-16-024 Issue B steps 1-4.33. PTs wore the correct PPE, used conservative decision making (asking for clarifications from Process Engineer prior to proceeding). PTs maintained Person-Person coverage.…

    • 76 Words
    • 1 Pages
    Improved Essays
  • Great Essays

    Govc Self Assessment

    • 3668 Words
    • 15 Pages

    I have enclosed three fitness evaluation report enclosure (1) is for the period prior to my GOVCC misuse, demonstrating good judgment, trustworthiness and reliability. Enclosure (2) is the adverse fitness report for the period I received a 6105, also acknowledging my negative behavior, and accepting the consequences of my behavior. Enclosure (3) is for the period after my treatment, and recovery, showing renewed good judgment, trustworthiness and reliability. During this period 2015 I was awarded a Certificate of Commendation signed by Brigadier General Michael A. Minihan USAF, Colonel Christopher J. PaPaj USMC, and Graisri, Gesorn Rear Admiral, Royal Thai Navy, for my efforts during OPERATION SAHAYOOGI HAAT enclosure (4). It has been one…

    • 3668 Words
    • 15 Pages
    Great Essays
  • Superior Essays

    Pasco Case Study Answers

    • 1049 Words
    • 5 Pages

    Pasco/Chris – Attached for your review and use is a copy of the written responses received from each of the MEs specifically addressing and responding to the budgetary concerns that emerged at biennium close. I believe the meetings held last week with the MEs were helpful and constructive as we walked through the specific series of events related to biennium close; discussed errors that were made in budgeting, billings and expenditures; and candidly discussed the controls and why these controls failed. Most importantly, we came away with specific recommendations to begin implementing immediately to avoid recurrence in the future. In summarizing the themes associated with each of the areas of requested, I offer the following: • What specifically caused the over-expenditures (what, where and why)?…

    • 1049 Words
    • 5 Pages
    Superior Essays
  • Improved Essays

    Rapid Runway Rr History

    • 979 Words
    • 4 Pages

    Running head-HISTORY OF LIGHT AIRFIELD REPAIR PACKAGE 1 History of Light Airfield Repair Package and how it is used in the Military Arnold O. Gerodias Engineer Senior Leaders Course 22 February 2016 Abstract The United States Army has assets that contribute greatly to the mission of Airfield Seizure. A method used for Airfield Seizure is Forcible-Entry. One of Forcible-Entry task is Rapid Runway Repair by using Light Airfield Repair Package (LARP).…

    • 979 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Furthermore, the incident spurred litigation between the relatives of the victims and Boeing, purporting a mechanical failure as the blame. The prosecutors are eligible for approximately $180,000 in compensation as supposed by the Montreal Convention, 1999 (International trade/commercial law), which would be considered a provision, in accordance with IAS 37. They can also fight the case for further reimbursement for damages, which creates contingent liabilities. Calculating the provisions and adjusting for future events can cause financial reporting complications and generally ends up being merely disclosed.…

    • 97 Words
    • 1 Pages
    Improved Essays
  • Improved Essays

    1972 Flight 96 Crash

    • 410 Words
    • 2 Pages

    The following disaster summary includes information from The NTSB’s Official Aircraft Accident Report (1973). On June 12, 1972 Flight 96 departed from Detroit at 18:36 and began ascending to cruising altitude. Meteorological information was reported to be very good with light winds and cool temperatures. A post-incident interview with a ramp service agent who loaded baggage on the plane was conducted, and the agent described mild difficulties in closing the aft cargo door.…

    • 410 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Rolls Royce

    • 876 Words
    • 4 Pages

    Answer 1: A higher worth currency does make the exports of a country more expensive and makes the import cheaper in the domestic markets. Similarly, a lower worth currency makes the exports of a country cheaper and makes its imports more expensive in the domestic markets. Here the domestic currency is the British pound and the foreign currency is the USD. The large civil engine contracts were set and fixed in US dollar terms and conditions. If the dollars gets strengthened, Rolls Royce will be going to enjoy windfall profits and a lower exchange rate will be leading to a loss.…

    • 876 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Jos A Bank Case Study

    • 2526 Words
    • 11 Pages

    Discuss the significant aspects of quality control as they relate to this process. The Jos A Banks factory seemed to be split the foremen were chiefly responsible for checking quality and plant manager were responsible for product. Jos A banks had rigid standards; workers didn’t get paid for re-work. Bolt fabric was inspected and marked when received and any flaws were trimmed out during cutting. There were numerous inspection areas throughout the process from beginning to end and all products were given a final inspection once production was completed.…

    • 2526 Words
    • 11 Pages
    Improved Essays
  • Improved Essays

    Structural Design Methods The design methods of the Airbus A380 and the Boeing 787 Dreamliner are quite different. The Airbus A380 has a GP 7200 engine with four turbo fan layout whereas the Boeing 787 Dreamliner has a Rolls-Royce Trent 1000 engine with a twin turbo layout. The Airbus has a total length of 72.72 meters and the Boeing has a length of 56.7 meters. The internal cabin width of the Airbus is 6.54 meters and the Boeing is 5.5 meters. The wingspan of the Airbus is 79.75 meters and the Boeing has a span of 60 meters.…

    • 1723 Words
    • 7 Pages
    Improved Essays
  • Improved Essays

    1.0 Introduction This paper will outline the framework of effective Pipeline Integrity Management as it is used in Shell. Pipeline Integrity Management is a holistic, multi - disciplinary management system designed to ensure our pipeline asset: • is safe to operate today and till end of required life, • does not harm people, • does not pollute the environment, • transports fluids effectively and efficiently, to the desired optimal level, to meet customers’ needs whilst being responsible to the communities we operate in. The pipeline asset or system requires a careful definition to ensure that boundaries are well understood and interfaces between allied systems are clearly managed. Pipeline Integrity Management requires a systematic,…

    • 934 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Warranty Case Study

    • 769 Words
    • 4 Pages

    Repair or replacements are warranted for the remainder of the original warranty period. All Warranty claims are subject to approval by Diesel Performance Products, Inc. A Return Material Authorization (RMA) number must be obtained before any product is to be returned to Diesel Performance Products, Inc. for warranty consideration, repair or product return. Requests for product returns must be offset by an equal value order. Returned parts must be complete and in resalable condition.…

    • 769 Words
    • 4 Pages
    Improved Essays